Building owner
With an area about 2,500 km², it is the fourth largest district within Germany, although the population is only about 130,000.
www.kreis-lwl.de
User
The hospital is occupied by the owner.
Utilization
The building is used as a typical hospital with rooms for patients, operating rooms, a kitchen and office rooms.
Building concept
The hospital is composed of three buildings: 1) the original building which was renovated between 1999 and 2002, 2) the new wing which was constructed between 1994 and 1998 and 3) a functional building that hosts the central heating plant.
HVAC concept
The building has its own central heating building which provides heat for the hospital. The boiler was replaced in 1995. Heat recovery is available for the ventilation system.
General data
| Owner | District Ludwigslust |
| Year of erection | 1995 |
| Use | Hospital |
| Net floor area | 16.000 m² |
| Number of beds | 172 |
| Consumption of electricity | 1.620.000 kWh/a |
| 101 kWh/m²a | |
| Consumption of heating | 3.250.000 kWh/a |
| 203 kWh/m²a | |
| HVAC equipment | heating, cooling, air conditioning, |
| ventilation, building automation system | |
| Energy source | gas |
Comments
This item has not yet been commented. Please feel free to send us a comment of your own.