HoHo Vienna is one of the tallest wooden buildings in the world and a lighthouse project for sustainable timber construction. Thanks to the level of thermal insulation, resource conservation, energy efficiency and sound insulation, it has been awarded with the certification LEED Gold and ÖGNB gold from the Austrian Society for Sustainable Buildings.  
Post date: 1 Jun 2020
Type: Case

The architect firm Snøhetta, in collaboration with Arctic Adventures of Norway, Asplan Viak and Skanska, has designed “Svart”, the world’s first Plus Energy hotel in a Northern climate.
Post date: 25 May 2020
Type: Case

klimaaktiv bronze*   New apartment building completed in 2020. The entire residential complex is planned to be barrier-free. It is the new construction of a residential complex as passive house construction with 12 barrier-free or adaptable apartments, 4 of which are intended as serviceable apartments. There are also 13 underground parking spaces and 5 outdoor parking spaces.  
Post date: 7 May 2020
Type: Case

Klimaaktiv Silver *   The construction of the building was aimed, on the one hand, to offer affordable sustainable housing and on the other hand to plan an extension with quality of life and without any conflicts of use and in energy consumption.
Post date: 3 May 2020
Type: Case

Backed by its mission to protect the Pacific Northwest’s natural environment and promote healthy and sustainable ecosystems, the Bullitt Foundation wanted their new headquarters to be built to the highest level of sustainability. They also wanted the building to be a demonstration project that would set a new standard for developers, architects, engineers and contractors.  
Post date: 29 Apr 2020
Type: Case

The Lycée pour Professions de Santé in Ettelbruck, now the largest wooden building in the Grand Duchy, is a pilot project. It is indeed the first Luxembourg public building with positive energy. It is also the first in Luxembourg to aim for a "Minergie-P- ECO" certification. In addition to the comfort of the occupants, which reaches its highest level thanks to this certification, it is also the ecological footprint of the building that has been at the centre of attention since the design phase.  
Post date: 19 Apr 2020
Type: Case

When the new grammar school building was erected in Diedorf, an ‘integrated design process’ was applied, demonstrating that it is possible to plan innovatively and sustainably and still ensure that available resources are used economically and sparingly throughout the entire life cycle of a building.  
Post date: 17 Apr 2020
Type: Case

This 600 square-metre plot was used to erect a new service centre that would not only encompass a bank branch but also consultation rooms for customers and staff. Overall the building spans a total usable floor area of 1800 square metres. The energy consultant used dynamic computer simulations and local climate records to design the building and select materials.  
Post date: 14 Apr 2020
Type: Case

Located between the Bank of England and St Paul’s Cathedral, Bloomberg’s new European headquarters occupies 3.2 acres and will provide approximately 1.1 million square feet of sustainable office space. Clad in traditional stone and bronze, the building is sympathetic to its context and will improve the surrounding public realm.   Innovation Highlights:  
Post date: 6 Apr 2020
Type: Case

This is a project involving the transformation of an old farmhouse in the foothills of the Alps: the aim was to create a sustainable and (as far as possible) self-sufficient surplus-energy building.  The Langes Haus development should also be able to operate entirely on local renewables.  
Post date: 23 Mar 2020
Type: Case