Practices

Sorted by
Storžek Kindergarten: Slovenia

Storžek Kindergarten: Slovenia

The kindergarten was built in 2012. The main energy related targets were passivehouse/plus house standard, use of prefabricated timber facades, installation of a central ventilation system and achieving excellent airtightness. General...
IEE ZEMedS

ZEMedS project: solutions for nZEB renovation of schools

Case Studies of the ZEMedS project The Intelligent Energy Europe (IEE) ZEMedS (Zero Energy MEDiterranean Schools) project has developed nearly Zero-Energy Buildings (nZEB) toolkits that have been applied to 10 case studies, with...

Central workshop and administrative building (ZWuV) - Frankfurt

The Central workshop and administrative building (ZWuV) is a new office building used by the Department for Road Construction and Development, the Department for Parks and the Head of Energy Policy of the City of Frankfurt.  The building...

Passive House Lac de Vouglans (Jura 39)

Detailed description: The passive house at the Lac de Vouglans is a residential dwelling for 4 habitants. Total living surface (usable floor area UFA): 150 m2.Building envelope: Flat roof: 24 cm (12 cm +...

ZEMedS project: solutions for nZEB renovation of schools

Case Studies of the ZEMedS project The Intelligent Energy Europe (IEE) ZEMedS (Zero Energy MEDiterranean Schools) project has developed nearly Zero-Energy Buildings (nZEB) toolkits that have been applied to 10 case studies...

Storžek Kindergarten: Slovenia

The kindergarten was built in 2012. The main energy related targets were passivehouse/plus house standard, use of prefabricated timber facades, installation of a central ventilation system and achieving excellent airtightness. ...

Gymnasium Reutershagen: Germany

Instead of attending two different school sites in the Rostock suburb of Reutershagen, the school pupils shall in the future be taught in a central and expanded school building that has been refurbished in terms of its energy efficiency....

Søreide primary school: Norway

The school was built in 2012/13 as a public private partnership. The main energy related targets were to achieve passive house standard, to use prefabricated timber facades and renewable energy sources. The building should reach high...

St. Leonhard Primary School and Kindergarten: Municipal renovation in Austria

To accommodate the growing number of students attending the St. Leonard School built in 1964, the school was expanded and modernized. In 2010, the site has also incorporated a kindergarten, an after-school club and a public library.   The...

Hanaa EL ALF - Rte Unit, Ain Sbaa, Casablanca

The "32 Hanaa El Fal buildings in Ain Sbaa"  project incorporates energy efficiency provisions and aims to comply with the code of Energy Efficiency in the Construction (CEEB). In addition, the project has a strong social connotation as...