The scope of the Ecodesign Lot 6 preparatory study is ventilation and also air-conditioning systems. The published reports are for the air-conditioning part of the study and consider chillers of capacity greater than 12 kW and other parts of the AC systems like fan coils.
- Task 6 provides identification and evaluation of design options, BNAT (best not available technology) analysis, sensitivity analysis and system improvement potential of the product group.
- Task 7 provides an overview of policy options and an impact analysis.


