We will have a scientific and research program on the first day and a very practical program on the second day. What would be your interests, ideas?
Please post your ideas in this blog ...
In the preliminary works to prepare the recast of the EPBD (2009), the European Parliament had accepted the principle of a change of the EPBD to extend the inspection of air ...
Work in progress about the recast of the EPBD shows that the requirements for the inspection of air conditioning systems could change.
The proposal for the recast of the EPBD by ...
The design objectives of this 1750 m² office building were to develop a sustainable and ecological building, integrated with its surroundings and providing a high level of individual control and ...
The building is naturally ventilated, except for toilets and kitchen which are required by Danish
building regulations to have a mechanical exhaust. Natural ventilation is automatically ...
The building has an air-conditioning system with mechanical supply and exhaust ventilation and
chilled beams. Outdoor air is filtered and heated or cooled in central air handling units and ...
The building incorporates both natural and mechanical ventilation. Basic ventilation is provided
by the HVAC system which operates when either heating or cooling is required, or when ...
On 14th May 1996 the nation-wide exemplary pilot project „Solar building Leinefelde 2000“ was officially opened. This project is regarded as a front-runner in the sector of energy saving as the ...
HOPE was a collaborative European project, which aimed to demonstrate that energy efficient buildings can be both healthy and comfortable for their occupants. Buildings (both domestic and ...