Building professionals

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Post date: 15 Čer 2009
Type: Věc

ECOSM in figure : Total surface area of the building : 1511 m2 Cost of construction : 2.1 millions euros or 1390 €/m2 42 photovoltaic membranes : 17.14 kWc LED lighting : 786 Watts Heat Pumps : 4 (inside the eco-sphere) 243 Wirecom technologies electronic cards 182 sensors : temperature, hygrometry, luminosity, rain, wind, pressure 312 actuators Construction and insulation of walls :
Post date: 15 Čer 2009
Type: Věc

The project concerns testing and implementing of PICO method for implementation of energy efficient lighting in public utility buildings.
Post date: 15 Čer 2009
Type: Věc

Post date: 15 Čer 2009
Type: Věc

Post date: 14 Čer 2009
Type: Odkaz

Array
Post date: 14 Čer 2009
Type: Event

Array
Post date: 14 Čer 2009
Type: Event

Post date: 14 Čer 2009
Type: Publication

Post date: 14 Čer 2009
Type: Publication