Heating and hot water systems in buildings

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Array
Post date: 27 Dez 2009
Type: Ereignis

Array
Post date: 27 Dez 2009
Type: Ereignis

Post date: 21 Dez 2009
Type: Link

The largest Passive House project in Europe (project Lodenareal) has been opened in October 2009 in Innsbruck, the capital city of Tirol  (Austria). About 35.000 m² (brutto) for 354 flats (26.000 m²) have been build by the building owner Neue Heimat Tirol (www.neueheimattirol.at), a social housing company providing affordable flats for the citizens. The heat energy demand is to be 15 kWh/m².year, as calculated by the PHPP software.
Post date: 21 Dez 2009
Type: Fall

Post date: 21 Dez 2009
Type: Tool

Post date: 21 Dez 2009
Type: Tool

EED

Post date: 21 Dez 2009
Type: Tool