Building envelope (walls, windows,...)

This house is located in Schnersheim, a village of 750 inhabitants, 20 km away of the head of the Alsace Region, Strasbourg. The house is a former farm and is constructed on a light slope. The basement and two walls giving to the national road are in rubbles of sandstone and limestone. The storeys are timber-framed, filled with cob or hand-made bricks produced on site. It has a heated area of 350 m² on two storeys. The basement and the attic are not heated.
Post date: 21 Jan 2020
Type: Fall

Introduction BIM is a key part of the fourth revolution (digitalisation) of the AEC industry (Architecture, Engineering and Construction) and an enabling tool for a cleaner and more sustainable build environment.   This has been recognised by the European commission, and several H2020 funded projects, including BIMcert, are focusing in providing training frameworks and support in order to upskill the industry.  
Post date: 20 Jan 2020
Type: News

March 23-24, 2020 UPM Madrid, Spain The EBC Research Programme  
Post date: 17 Jan 2020
Type: Ereignis

Exhibition MOLDENERGY – a stimulus for sustainable development!   Numbers from MOLDENERGY 2019  
Post date: 16 Jan 2020
Type: Ereignis

Did you add energy goals to your New Year’s resolutions list? Why not start 2020 off by sharing them at the EU Sustainable Energy Week (EUSEW)?    EUSEW 2020 will be an extremely special week-long event, running from 22 to 26 June 2020, and we do not want you to miss out!  
Post date: 16 Jan 2020
Type: News

The Osram Building was originally built in 1953 as an office and warehouse for A/S Dansk Osram, i.e. a lightbulb manufacturer. The building was the first prefabricated building in Copenhagen, and it was built in shock concrete or shavings, as it is also called. The construction method was developed in Holland, and in involves includes powerfully shaking the concrete. The elements hereby get a very close and uniform structure.
Post date: 16 Jan 2020
Type: Fall

The building is a symmetrical structure with two wings, which frame the forecourt of the Lazaristenkirche. The north wing was the subject of renovation. It dates from the late "Gründerzeit" period of 1884-1918, was built in 1904 and designed by architect Cajetan Miserowsky. The renovated building is located on the north side and has a predominantly south-facing orientation of the habitable rooms. The north side to the adjacent Sophienspital is a closed firewall. The narrow side to the west faces the private garden.  
Post date: 16 Jan 2020
Type: Fall

DOKVAST developed a sustainable and high-quality distribution centre for Rhenus Contract Logistics at the industrial area Het Laar in Tilburg. The distribution centre, named “The Tube”, consists of three linked compartments with mezzanine floors at two levels that are suitable for Value Added Services (VAS) and/or (future) expansion of the office.   With an overall score of 99.4% on all individual sustainability categories New Logic III delivers an exceptionally high performance.  
Post date: 15 Jan 2020
Type: Fall

The Bauen & Energie is the leading platform for trends in building, energy efficiency, smart home, spa and wellness in Lower Austria, Vienna, Burgenland and neighbouring countries.   On 35,000 m² our 500 exhibitors meet an audience with purchasing power and our trade visitors appreciate the exhibition as an ideal place for networking and exchange within the industry.  
Post date: 13 Jan 2020
Type: Ereignis

EcoHouse è una nuova manifestazione che propone materiali e tecnologie per l’efficienza energetica.   EcoHouse si affianca alla 12° edizione di Progetto Fuoco, che con più di 750 espositori e oltre 75.000 visitatori, è il più importante appuntamento mondiale per il settore del riscaldamento a biomassa.  
Post date: 10 Jan 2020
Type: Ereignis