sustainability

The Award winners are: BREEAM Bespoke - awarded to the new  Bletchley Leisure Centre, a key element in the regeneration of Central Bletchley, designed by Holder Mathias Architects and constructed by SDC for Milton Keynes Council. The design team took particular care to minimise the environmental costs in use, for example by incorporating a biomass boiler and reducing water consumption wherever possible.
Post date: 10 Mär 2010
Type: News

Günther Oettinger, Commissioner responsible for Energy, said: "B iomass is one of the most important resources for reaching our renewable energy targets. It already contributes more than half of renewable energy consumption in the EU, providing a clean, secure and competitive energy resource. With this report, the Commission provides recommendations to Member States concerning sustainability criteria for solid biomass and biogas. A review is foreseen in 18 months in order to assess whether the scheme needs to be modified, including through the introduction of some mandatory standards...
Post date: 1 Mär 2010
Type: News

The report is broken down into nine key themes as follows: Flood risk • The Thames Barrier has been raised 114 times to protect London from tidal and fluvial flooding since it became operational. Closures are becoming more frequent with two thirds occurring since 2000. Climate change may increase the risk of flooding, and require the barrier to be closed more often in the future. • Approximately half a million properties are in the floodplain in London.
Post date: 25 Feb 2010
Type: News

Array
Post date: 15 Feb 2010
Type: Ereignis

Array
Post date: 10 Feb 2010
Type: Ereignis

Array
Post date: 1 Feb 2010
Type: Ereignis

Array
Post date: 7 Dez 2009
Type: Ereignis

Array
Post date: 9 Okt 2009
Type: Ereignis