
Case Studies of the EU Energy Poverty Observatory (EPOV) showcase successfully implemented energy poverty measures in...
In 2010, the energy efficiency of housing had been improving significantly in Lithuania over the previous ten years in part...

Project type : Renovation
Building Type : Office building < 28m
Construction Year : 2015
Delivery year : 2017
Climate...
The renovation of the THEODORE building is in line with the desire of AG Real Estate to participate in...
The two-group kindergarten with an exercise room includes a sustainable architecture and energy concept.
Mainly ecological building materials are used for the south-facing low-energy house. Generous window areas and well thought-out...
Passives office having obtained the Passif Plus label with in particular a large surface area of photovoltaic panels.
Treated Floor Area according to PHPP: 217 m2
Construction type: timber construction
Year of construction: 2019
...
The renovation of this residential building locate in Munich was implemented in the framework of the FP7 funded E2Rebuild project:
The residential multi-storey building in the suburb of Sendling, Munich (Germany), owned by the public...
The former fire station is a listed building, which was built in 1926 by architect Franz Baumgartner in the style of the architecture at the lake Wörther See. It is now used as a music school. The building is characterised by its strongly...
Fiddleback House provides a young family with contemporary living in a certified Passive House that respects the pristine alpine environment of its surrounds.
Through intelligent design and collaborative decision making, Fiddleback House...
The 'Bale House' is the new Visitor Centre in Hastings Country Park Nature Reserve, funded by Hastings Borough Council with grant aid from the Interreg NWE programme.
From the foundations to facade, it is constructed from natural and...
As part of Finland’s centenary celebrations, Helsinki is now home to Oodi. It is a magnificent hybrid wooden construction and landmark that serves to refresh the city’s library services for 150 years to come.
The centrepiece of the...
The aim of the project and the associated construction measures is to repair the existing and restore the original condition.
The floor plans will be spatially and functionally separated, with the aim of consistently uncovering the core...