building energy performance

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Post date: 18 Δεκ 2009
Type: Tool

The first market approach is called 'Quality Declaration'. The declaration provides a checklist of quality criteria for outstanding boiler installations. It will be issued by installers and should form part of contracts with end consumers. The second approach is referred to as 'Performance Guarantee'. It centres on guarantees of high seasonal efficiencies and energy savings of new heating systems.
Post date: 16 Δεκ 2009
Type: Ειδήσεις

All over the EU, Social Housing organisations are increasing the energy efficiency of their housing stock, however there remains potential for further improvements. To accelerate this process,  experts from national and regional federations need a platform where they can learn from each others’ successes and mistakes, exchange advice, tips and experience on all issues related to energy use in social housing.  
Post date: 10 Δεκ 2009
Type: Θέμα

Array
Post date: 9 Δεκ 2009
Type: Συμβάν

Array
Post date: 4 Δεκ 2009
Type: Συμβάν

Vejlandshuset was completed in 2005. It is five storey office building with a central atrium and total floor area of 13 500 m². On the ground floor there are shared facilities including reception, cafeteria, and an open area for visitors. The four upper floors contain office space. The top floor also includes a plant room and an open terrace. Design occupancy is 600 and operating hours are between 07.00 and 18.00.
Post date: 25 Νοε 2009
Type: περίπτωση

YIT Office Building is a typical modern five-storey office building and was completed in October 2005. The ground floor (900 m²) serves as a workshop and storage facility and the remaining four floors (6 000 m²) have both open-plan and cellular office spaces. There is a large glass roofed atrium in the centre of the building extending  from the first floor to the roof. In the lower part of
Post date: 25 Νοε 2009
Type: περίπτωση

Array
Post date: 24 Νοε 2009
Type: Συμβάν