English

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Did you add energy goals to your New Year’s resolutions list? Why not start 2020 off by sharing them at the EU Sustainable Energy Week (EUSEW)?    EUSEW 2020 will be an extremely special week-long event, running from 22 to 26 June 2020, and we do not want you to miss out!  
Post date: 16 Ιαν 2020
Type: Ειδήσεις

About AICEE   
Post date: 16 Ιαν 2020
Type: Σύνδεσμος

Integrated Management Support for Energy efficiency in Mediterranean PUblic buiLding Six libraries of municipal-building typologies Through the testing of exhaustive data-collection approaches, IMPULSE seeks to categorize public buildings at local level and create inventories for each pilot City.  
Post date: 16 Ιαν 2020
Type: Σύνδεσμος

The Osram Building was originally built in 1953 as an office and warehouse for A/S Dansk Osram, i.e. a lightbulb manufacturer. The building was the first prefabricated building in Copenhagen, and it was built in shock concrete or shavings, as it is also called. The construction method was developed in Holland, and in involves includes powerfully shaking the concrete. The elements hereby get a very close and uniform structure.
Post date: 16 Ιαν 2020
Type: περίπτωση

The building is a symmetrical structure with two wings, which frame the forecourt of the Lazaristenkirche. The north wing was the subject of renovation. It dates from the late "Gründerzeit" period of 1884-1918, was built in 1904 and designed by architect Cajetan Miserowsky. The renovated building is located on the north side and has a predominantly south-facing orientation of the habitable rooms. The north side to the adjacent Sophienspital is a closed firewall. The narrow side to the west faces the private garden.  
Post date: 16 Ιαν 2020
Type: περίπτωση

The concern for climate change and environmental challenges is rising.   We receive information, data and images about natural phenomenon caused by climate change on a daily basis.   Those events often recall us to a very direct call to action.  
Post date: 15 Ιαν 2020
Type: Συμβάν

9,000 attendees are expected to congregate from across the world including CTO’s, Heads of Innovation and Technology, IT Directors, Developers, Start-Up’s, OEM’s, Government, Automotive, Operators, Technology Providers, Investors, VCs and many more.  
Post date: 15 Ιαν 2020
Type: Συμβάν

Why come to MIPIM? Exhibition: With 22,000 m² exhibition space, MIPIM is the premier real estate event expo to discover opportunities and meet key international stakeholders.   Conferences: A leading programme of 130+ conference sessions providing expert insight into key sectors and property hotspots.  
Post date: 15 Ιαν 2020
Type: Συμβάν

As part of the sustainability planning within BIMcert and with other EU BIM projects we have collaborated to form BIMalliance.  The primary aim of this is to enable BIMcert to develop an exploitation plan in collaboration with other partners. This collaboration also enables all partners in BIMalliance to share materials, modules and learning material.
Post date: 15 Ιαν 2020
Type: Ειδήσεις

DOKVAST developed a sustainable and high-quality distribution centre for Rhenus Contract Logistics at the industrial area Het Laar in Tilburg. The distribution centre, named “The Tube”, consists of three linked compartments with mezzanine floors at two levels that are suitable for Value Added Services (VAS) and/or (future) expansion of the office.   With an overall score of 99.4% on all individual sustainability categories New Logic III delivers an exceptionally high performance.  
Post date: 15 Ιαν 2020
Type: περίπτωση