Innsbruck is one of the pilot cities of the FP7 project SINFONIA, and selected its eastern district to demonstrate the large scale implementation of energy efficient measures, with the objective of achieving on average 40 – 50% primary energy savings in the demo sites and to increase at least by 30% the share of renewables in the district’s energy mix.  
Post date: 6 Oct 2020
Type: Case

The building, a residential construction designed by DMDV Arquitectos and built in 2020, represents an exemplary nZEB with that reached also the certification of Passivhaus Plus.  
Post date: 23 Sep 2020
Type: Case

The project belongs to a larger urban intervention with the new Grand Parc in Bordeaux, with green area and public spaces, and it occupies a central place in redefining the neighbourhood. It also has an identity vocation because it constitutes a visual catch from the perspective created by the plot where it is located. The volume, simple but slightly decomposed, expresses the public and private use of the building and highlights a forecourt that opens on the urban project of the Grand Parc.  
Post date: 1 Sep 2020
Type: Case

The building has been nominated for the BREEAM Energy award 2020 and it is a very ambitious construction in the city centre of Warsaw. The location was originally occupied by a block of flats of 10 floors built in 1960, that was demolished in 2017, in order to enable the construction of the new complex, more in line with the new needs of the Warsaw’s office market.  
Post date: 31 Jul 2020
Type: Case

The new Central Building of Leuphana University represents an exemplary sustainable campus. It is part of the "Climate-neutral campus" project, which was nominated for the German sustainability award. The building concept and design started from an idea elaborated from a group of students within a university seminar with the architect Daniel Libeskind.    
Post date: 30 Jul 2020
Type: Case

Called Sport'Co, the Beaucouzé sports complex (49) opened its doors in early March 2019. In many ways, this positive-energy public school illustrates the right balance between fundamental values and innovative ideas. While meeting the functional requirements of a structure dedicated to team sports, it is characterized by exemplary technical and economic performances:
Post date: 28 Jul 2020
Type: Case

The renovation of the residential complex of Via Passeggiata dei Castani is one of the interventions developed within the FP7 Smart City project SINFONIA and has been concluded at the beginning of 2019.   The area is located in the east side of the city of Bolzano, under a mountain and the complex has been build in the ‘90ies. The complex is owned by the Municipality of Bolzano and it is composed by two buildings, that have 72 apartments distributed by four staircases for a total surface of 7456 m2.
Post date: 28 Jul 2020
Type: Case

The scope of the project was to increase the office surface through a roof extension, having a surface of around 900 m2, following sustainability and energy efficiency criteria.  
Post date: 17 Jul 2020
Type: Case

Project type: New Construction Building Type: Equipment, forestry services Construction Year : 2018 Delivery year: 2018 Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season. Net Floor Area: 852 m2 Other Construction cost: 1 756 543 € Cost/m2: 2 062 €/m2   Contractor: IBGE
Post date: 14 Jul 2020
Type: Case

HoHo Vienna is one of the tallest wooden buildings in the world and a lighthouse project for sustainable timber construction. Thanks to the level of thermal insulation, resource conservation, energy efficiency and sound insulation, it has been awarded with the certification LEED Gold and ÖGNB gold from the Austrian Society for Sustainable Buildings.  