none

The project (planned for completion in 2019) is part of a study that compares the practical comparisons of different energy concepts for highly efficient, ecological and economically operated multi-family dwellings. One goal here is to achieve the lowest possible energy and heating demand in the operation of the building. For this purpose, different variants were already planned and selected for the construction, such as heating system and building shell according to the latest research findings.
Post date: 17 Sep 2019
Type: Case

The 3-storey detached house was completed in 2019 and was built as a mixed construction (solid / wood).    The basis for the planning is an energy-efficient and ecological construction, which ensures a sustainable lifestyle with low energy consumption and associated minimum energy costs.    The heating of the object takes place via an air heat pump. The installation of a comfort ventilation ensures fresh, healthy air.  
Post date: 10 Sep 2019
Type: Case

Bexel Consulting is a high-tech, construction and engineering consultancy company. They designed, built, and constructed the Sensatori and Nickelodeon Hotels and Resorts.   This beachfront resort, placed on the east coast of Dominican Republic, features 460 suites designed to cater to a variety of travel experiences.  
Post date: 6 Sep 2019
Type: Case

The goal of the Perlita Project is to show a new path for low energy consumption buildings in Los Angeles and in Southern California through realistic, affordable and reproducible solutions.   The main focus was the energy efficiency. We followed the PassiveHouse standard path, which is the leading international low energy building standard with more than 85,000 buildingsaround the globe in all climate zones, to deliver ahigh level of comfort with very low energy consumption.  
Post date: 29 Aug 2019
Type: Case

Description générale:   Situé sur un ancien site de Belgacom, devenu terrain en friche, le bâtiment dédié au durable s'élèvera sur deux étages le long de la rue Dieudonné Lefèvre. Au rez-de-chaussée, les ateliers (sur 5.000 m2) ; et à l'étage, les espaces liés aux incubateurs d'entreprises (sur 2.500 m2).   
Post date: 29 Aug 2019
Type: Case

This new residential complex in Tirol, completed in 2018, is a passive house construction with 20 condominiums, 19 underground parking spaces and 8 carport spaces. The structure is U-shaped and is divided, due to the slope, in a basement with underground parking, a ground floor and 4 other above-ground floors.   The outstandingly low levels of energy demand and consequential CO2 emissions have made it achieve the Bronze status of the Austrian klimaaktiv criteria.  
Post date: 26 Jul 2019
Type: Case

Unique view and idyllic location, this project in the heart of Vienna consists of 117 privately financed condos. Its planned completion is foreseen for 2019.   The building presents a promising living space in a prime location - right next to the Otto-Benesch-Park and the recreational area near the Wienerberg pond.   
Post date: 23 Jul 2019
Type: Case

This case study represents a rehabilitation and energy renovation of a 1970 condominium. It consists of a small joint ownership of 23 lots in Sevran (in Paris suburbs) as part of the "OPAH Quartier Rougemont" with the operator OZONE.  
Post date: 19 Jul 2019
Type: Case

Large companies are looking to equip themselves with a bottom-up approach to foster environmental performance in buildings to complement the top-down policies available in their significant portfolios (certifications, ISO 50001, facility management progress plans, etc.).  
Post date: 12 Jul 2019
Type: Case

This is the first block of housing certified in Spain built in 2017 under the Passivhaus standard, and therefore has a demand for heating below 15kWh / m2a, and a heating load of 10W / m2.   This implies that a floor of 75m2 will have a heating load of only 750W, so with a hair dryer there would be enough to heat two houses.   To achieve this the following principles have been applied:  
Post date: 1 Jul 2019
Type: Case