French

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Open book EPC for Brussels’ condominiums How can easyCOPRO help you?   By offering :  
Post date: 19 Mar 2020
Type: Link

As a visible sign of the shift from fossil fuels to renewable energies, a former coal silo and heating plant in Basel is covered with coloured PV modules. The entire site is under heritage protection, the remodelled building was required to match the style and colour scheme of the site.  
Post date: 11 Mar 2020
Type: Case

Municipalities and regions have a key role to play in the energy retrofit of condominiums. Many of them are already addressing the residential sector as part of their climate policies, but they are still often unaware of the specific challenges and needs of condominiums. Find out about the strategies and tools developed by two European projects, ACE-Retrofitting and INNOVATE, to better address condominiums.  
Post date: 10 Mar 2020
Type: Event

Mercado del Val is an iron market located within the old town of Valladolid. Its construction was completed in 1882. The rectangular floor plan is 120 meters long times 19 meters wide, with chamfered corners. It had stones for foundations and plinth and iron for the other elements. Natural ventilation was performed through openings covered by blinds of iron sheets.  
Post date: 20 Feb 2020
Type: Case

The farmhouse was built in 1646 in log construction and was home of the painter Angelika Kaufmann. The living part of the house has been restored in 2008 and the affiliated barn was rebuild in 2013. The traditional renovation of the front building was done in the same architectural style as the existing.  
Post date: 19 Feb 2020
Type: Case

BIM for Energy Efficiency in the Public sector About the project  
Post date: 12 Feb 2020
Type: Link

Minimising Energy Consumption for Green Buildings respecting present uses and public needs About the project  
Post date: 12 Feb 2020
Type: Link

The SMARTER Finance for Families H2020 project intends to replicate the success of the Green Homes/ Green Mortgages (GH/GM) programme initiated by the Romanian Green Building Council (RoGBC). By the beginning of 2019, the Romanian program had signed agreements with 25 investors to build more than 6,500 housing units in Romania meeting strict green standards.
Post date: 3 Feb 2020
Type: News

This house is located in Schnersheim, a village of 750 inhabitants, 20 km away of the head of the Alsace Region, Strasbourg. The house is a former farm and is constructed on a light slope. The basement and two walls giving to the national road are in rubbles of sandstone and limestone. The storeys are timber-framed, filled with cob or hand-made bricks produced on site. It has a heated area of 350 m² on two storeys. The basement and the attic are not heated.
Post date: 21 Jan 2020
Type: Case

The building is a symmetrical structure with two wings, which frame the forecourt of the Lazaristenkirche. The north wing was the subject of renovation. It dates from the late "Gründerzeit" period of 1884-1918, was built in 1904 and designed by architect Cajetan Miserowsky. The renovated building is located on the north side and has a predominantly south-facing orientation of the habitable rooms. The north side to the adjacent Sophienspital is a closed firewall. The narrow side to the west faces the private garden.  
Post date: 16 Jan 2020
Type: Case