Building operation and energy management systems

HOCHH(IN)AUS

Unique view and idyllic location, this project in the heart of Vienna consists of 117 privately financed condos. Its planned completion is foreseen for 2019.   The building presents a promising living space in a prime location - right next to the...

Buhnici House - Premium Passive House Certified 2018

Este prima casă pasivă premium din România și în top 10 din lume, este o casă construită de la buldozer la întrerupător în mai puțin de 7 luni, este o casă cu materiale și tehnologie de rachete spațiale în ea, este automatizată complet și înțesată...

HOCHH(IN)AUS

Unique view and idyllic location, this project in the heart of Vienna consists of 117 privately financed condos. Its planned completion is foreseen for 2019.   The building presents a promising living space in a prime location - right next...

Buhnici House - Premium Passive House Certified 2018

Este prima casă pasivă premium din România și în top 10 din lume, este o casă construită de la buldozer la întrerupător în mai puțin de 7 luni, este o casă cu materiale și tehnologie de rachete spațiale în ea, este automatizată complet și...

Magasin durable COOP à Etagnières, Suisse

Couvrant une surface de 1’348 m² au sol, le bâtiment détermine un volume simple, sur un seul niveau, marqué par la marquise d’entrée affirmant l’accueil des clients.   Le bâtiment est constitué d’une ossature en bois reposant sur une base...

Retrofit in Nordic countries: Haugerudsenteret (Oslo, NORWAY) – 4RinEU project

This Norwegian demonstration building is a two-floor building with eight small dwellings in total, located at Haugerud in the city of Oslo. Haugerud is a suburb in the east of Oslo with housing developments and houses...

Zetland Road: Deep Retrofit of Two Victorian semi-detached houses from 1894, Manchester UK

Deep ecological retrofit of two Victorian townhouses Chorlton, Manchester Completed: Autumn/winter 2018 Standard: Enerphit Plus -£43 per year (estimated total energy costs)   This Victorian property in the centre of Chorlton had spent many...

The Albero: Construction 21 Case Study

Albero project of rehabilitation, modernization and requalification of the architectural envelope is part of this urban dynamic as much by its singular aestheticism as by the proposed living environment wanted healthy and pleasant to live...

PV-ESTIA – an Interreg Balkan-Med project transforming buildings into a controllable energy source

In the framework of the PV-ESTIA project, the performance of the proposed PV+storage Innovative Management Scheme will be evaluated under real-field conditions. Pilot installations will be selected with the aim to examine if and how the...

Thermomodernization of Nursery in Chmielnik

Thermomodernization of the building of the Local Government Nursery in Chmielnik. Construction of the Local Government Preschool in Chmielnik it was started in 1959 and lasted until 1961. The building was put into use...