Practices

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Please, keep in mind that the only contact email for BUILD UP is contact@buildup.eu, any other address, even if similar, is not under our domain.

Headquarters of the Order of Architects Réunion in Saint Denis (France)

Share this Post:

Credits: Co-Architects

This project won the Grand Prize in the "Tertiary Buildings" category of the Circular Buildings Trophies 2022. The project involves renovating and raising a "concrete hut" typical of 21st century Reunionese architecture. Moreover, the project has following a circular approach, and the materials that could not be reused are locally sourced.

 

The design is based on the foundations of tropical bioclimatic architecture: through natural ventilation and solar protection.

 

Here below some data about the energy consumption:

 

Energy consumption

  • Calculation method: RTAA DOM 2016
  • Breakdown for energy consumption: final energy breakdown: ceiling fans (4.5), interior lighting (7), computer workstations and various power outlets (20), exterior lighting (1.5)
  • Primary energy need: 85,00 kWhep/m2.an
  • Primary energy need for standard building: 85,00 kWhep/m2.an
  • Initial consumption: 140,00 kWhep/m2.an

Real final energy consumption

  • Final Energy: 33,00 kWhef/m2.an
  • Real final energy consumption/m2: 33,00 kWhef/m2.an
  • Year of the real energy consumption: 2022

Read the case study here.

Award labels

Available link languages