Members

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Construction21 Build UP user's picture

Construction21 Build UP user

France

Speaks

Kudos
Case

Casa Bunyesc: Passive house in Lleida, Spain

A single-family house with a shared party wall between adjoining buildings which is comprised of a ground floor, first floor and basement for office and housing. The Casa Bunyesc Project began as a challenge to discover the comfort behavior of a...
Case

Passive house Magda

Dwelling with almost zero energy consumption. Just 3kWh/m2/year in front of the 150 kWh of the CTE HE minimum. Enhancing the requirements of the thermal efficiency according to the European guidelines in 2020. Bioclimatic design in order to (...)
Case

55 Social Housing Units in Bermeo

Case

Services building in Gamarra Sports Centre, Vitoria-Gasteiz

Case

New headquarters Bilbao, Naturgas energía Grupo SA.EDP

A BOX INSIDE A BOXThis Project, in Bilbao Spain, integrated the façade of a listed, historical building with a new interior structure and distribution of the existing building.  The original Rationalist façade had to be conserved as...
Case

CasAHStudio

Case

Orona IDeO – innovation city

Case

Rehabilitation of an Architecture Office

It is about a retrofitting of an ancient wood saw factory and its renovation into an office building for the Headquarters of ah asociados located at Cizur Menor-Pamplona (Navarra). The block consists of a two-storey building. It was necessary (...)
Case

Romania Green Building Council Office Unit

The building is undergoing a major renovation that is aspiring to achieve the Living Building Challenge and LEED Platinum status. The Energy Performance Certificate data currently displayed from this case study was completed in  accordance with (...)
Case

GecohomeProject