Italian

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

This document describes the results reached by the LEMON project, the tools - consultable on the website - and provides a series of useful suggestions to replicate the innovative deep retrofit process and avoid setbacks.   The tools elaborated and made available are:
Post date: 25 Sep 2020
Type: Publication

Wed 21, October 2020 11:30 - 13:00 CET   Please sign in with EU Login to vote.   In this workshop, the European City Facility (EUCF) joins forces with the Covenant of Mayors (CoM) and the H2020 PROSPECT project to discuss the implementation of financing schemes for climate & energy at local and regional level.
Post date: 23 Sep 2020
Type: Evento

La decarbonizzazione del patrimonio edilizio è tra le priorità del piano per la ripresa post-Covid e uno degli assi portanti del Green Deal europeo. Si stima infatti che il settore edile sia responsabile del 40% del consumo energetico e del 36% delle emissioni di gas serra in Europa.  
Post date: 16 Sep 2020
Type: Evento

The renovation of the residential complex of Via Passeggiata dei Castani is one of the interventions developed within the FP7 Smart City project SINFONIA and has been concluded at the beginning of 2019.   The area is located in the east side of the city of Bolzano, under a mountain and the complex has been build in the ‘90ies. The complex is owned by the Municipality of Bolzano and it is composed by two buildings, that have 72 apartments distributed by four staircases for a total surface of 7456 m2.
Post date: 28 Jul 2020
Type: Caso

This hard-stone elementary school is located in Mulhouse in the Alsace region (north-eastern France), near the border with Germany. It is a listed building, since it was built in XXVIII sec as a spinning factory at a time which Mulhouse had an active textile industry and became a school in 1870. It has recently been retrofitted with a project balanced between low energy consumption and heritage preservation, with the availability of a constraint budget.  
Post date: 6 Jul 2020
Type: Caso

FACEcamp project aims at strengthening a long-term transnational cooperation among companies and R&I entities in the field of advanced façade systems for healthy, comfortable and energy efficient buildings. FACEcamp goal is to support stakeholders to cope effectively with the facade performances.   Thus, the specific objectives are:  
Post date: 2 Jul 2020
Type: Enlace

CYPETHERM Improvements is a tool for energy audits and analysis of improvement measures in buildings. It has been developed and improved within the H2020 project RenoZEB and released by the company CYPE, partner of the consortium.  
Post date: 30 Jun 2020
Type: Tool

The building is used as a residential, and the aim of the renovation has been the conservation of the ancient walls of the medieval castle, considering modern comfort standards with the target of achieving a building ad a high standard of energy efficiency, (i.e. the NZEB standard).  
Post date: 23 Jun 2020
Type: Caso

The renovation of the residential complex of Via Brescia is one of the interventions developed within the FP7 Smart City project SINFONIA.   The building is divided in 5 staircases with 7 floors and 21 apartments each, with an overall surface of around 32,000 m3 and it is managed by IPES-WOBI, the social housing Institute of the Province of Bolzano.  
Post date: 21 Mayo 2020
Type: Caso

Sustainable energy Positive & zero cARbon CommunitieS Project description   An inclusive process for the urban sustainable energy transition to smart cities  
Post date: 12 Mayo 2020
Type: Enlace