Slovenian

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The Kohlerhaus, a building dating back to the 14th century, was renovated to accommodate 10 apartments with the high standards of comfort and efficiency. The historical research carried out by the architect revealed the rich past of the building, that served as priest house, hotel or guest house. The retrofit of the building included external insulation the wall with reed mats, new replica windows and new building services (radiating heating and mechanical ventilation).  
Post date: 2 Ene 2021
Type: Caso

This timber-framed building is located in Saint-Samson-la-Poterie in the Oise region (northern France), over Paris, and especially in the natural region called "Pays de Bray".   It was the barn of a landlord housing of the 17th century and it has recently been retrofitted and restored by the owner himself. A careful work on the materials and on the execution was made.  
Post date: 29 Nov 2020
Type: Caso

This hard-stone elementary school is located in Mulhouse in the Alsace region (north-eastern France), near the border with Germany. It is a listed building, since it was built in XXVIII sec as a spinning factory at a time which Mulhouse had an active textile industry and became a school in 1870. It has recently been retrofitted with a project balanced between low energy consumption and heritage preservation, with the availability of a constraint budget.  
Post date: 6 Jul 2020
Type: Caso

The building is used as a residential, and the aim of the renovation has been the conservation of the ancient walls of the medieval castle, considering modern comfort standards with the target of achieving a building ad a high standard of energy efficiency, (i.e. the NZEB standard).  
Post date: 23 Jun 2020
Type: Caso

ENVIROS, based in Prague, is one of the leading consultancy companies providing assistance and solutions mainly in the field of energy, environmental and business consultancy in the Czech Republic, Central and Eastern Europe, and also other parts of the world. The majority stakeholder of ENVIROS  is the UK based ENVIROS GLOBAL LIMITED.
Post date: 13 Mar 2020
Type: Enlace

As a visible sign of the shift from fossil fuels to renewable energies, a former coal silo and heating plant in Basel is covered with coloured PV modules. The entire site is under heritage protection, the remodelled building was required to match the style and colour scheme of the site.  
Post date: 11 Mar 2020
Type: Caso

Mercado del Val is an iron market located within the old town of Valladolid. Its construction was completed in 1882. The rectangular floor plan is 120 meters long times 19 meters wide, with chamfered corners. It had stones for foundations and plinth and iron for the other elements. Natural ventilation was performed through openings covered by blinds of iron sheets.  
Post date: 20 Feb 2020
Type: Caso

The farmhouse was built in 1646 in log construction and was home of the painter Angelika Kaufmann. The living part of the house has been restored in 2008 and the affiliated barn was rebuild in 2013. The traditional renovation of the front building was done in the same architectural style as the existing.  
Post date: 19 Feb 2020
Type: Caso

This house is located in Schnersheim, a village of 750 inhabitants, 20 km away of the head of the Alsace Region, Strasbourg. The house is a former farm and is constructed on a light slope. The basement and two walls giving to the national road are in rubbles of sandstone and limestone. The storeys are timber-framed, filled with cob or hand-made bricks produced on site. It has a heated area of 350 m² on two storeys. The basement and the attic are not heated.
Post date: 21 Ene 2020
Type: Caso

The Osram Building was originally built in 1953 as an office and warehouse for A/S Dansk Osram, i.e. a lightbulb manufacturer. The building was the first prefabricated building in Copenhagen, and it was built in shock concrete or shavings, as it is also called. The construction method was developed in Holland, and in involves includes powerfully shaking the concrete. The elements hereby get a very close and uniform structure.
Post date: 16 Ene 2020
Type: Caso