case studies

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The renovation of the residential complex of Via Passeggiata dei Castani is one of the interventions developed within the FP7 Smart City project SINFONIA and has been concluded at the beginning of 2019.   The area is located in the east side of the city of Bolzano, under a mountain and the complex has been build in the ‘90ies. The complex is owned by the Municipality of Bolzano and it is composed by two buildings, that have 72 apartments distributed by four staircases for a total surface of 7456 m2.
Post date: 28 Jul 2020
Type: Caso

The scope of the project was to increase the office surface through a roof extension, having a surface of around 900 m2, following sustainability and energy efficiency criteria.  
Post date: 17 Jul 2020
Type: Caso

This hard-stone elementary school is located in Mulhouse in the Alsace region (north-eastern France), near the border with Germany. It is a listed building, since it was built in XXVIII sec as a spinning factory at a time which Mulhouse had an active textile industry and became a school in 1870. It has recently been retrofitted with a project balanced between low energy consumption and heritage preservation, with the availability of a constraint budget.  
Post date: 6 Jul 2020
Type: Caso

The building "L'Etape" was built in the early 1960s in the city of Charity sur Loire. It is a social housing building and the renovation aims to create spaces for temporary houses, training and short-term activities organized by the municipality.   The existing building presents a rectangular form on 4 levels and a total floor area of around 502m².  
Post date: 2 Jul 2020
Type: Caso

Alnatura Working Environment is in the city of Darmstadt in Germany, and has been designed by Haas Cook Zemmrich STUDIO2050. This building is an example of new construction realized with a people-centric and sustainable design approach.   The building is the working place of 500 employees on three floors with a floor area of approximately 10,000 m2.
Post date: 26 Jun 2020
Type: Caso

Haugerudsenteret (Oslo, Norway) – Our first success story. Energy performance to be assessed The Norwegian demo case, located in Oslo, is the first example of a successful implementation of 4RinEU methodology. The renovation works took place in the second half of 2018 and lasted only eight weeks, during which the tenants kept living in their dwellings.
Post date: 23 Jun 2020
Type: Noticias

The building is used as a residential, and the aim of the renovation has been the conservation of the ancient walls of the medieval castle, considering modern comfort standards with the target of achieving a building ad a high standard of energy efficiency, (i.e. the NZEB standard).  
Post date: 23 Jun 2020
Type: Caso

The contest was aimed at a BBC 2005 Effinergie consumption level. We have reached the Passive level for the Media Library.  
Post date: 9 Jun 2020
Type: Caso

HoHo Vienna is one of the tallest wooden buildings in the world and a lighthouse project for sustainable timber construction. Thanks to the level of thermal insulation, resource conservation, energy efficiency and sound insulation, it has been awarded with the certification LEED Gold and ÖGNB gold from the Austrian Society for Sustainable Buildings.  
Post date: 1 Jun 2020
Type: Caso

klimaaktiv bronze*   New apartment building completed in 2020. The entire residential complex is planned to be barrier-free. It is the new construction of a residential complex as passive house construction with 12 barrier-free or adaptable apartments, 4 of which are intended as serviceable apartments. There are also 13 underground parking spaces and 5 outdoor parking spaces.  
Post date: 7 Mayo 2020
Type: Caso