case studies

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The project (planned for completion in 2019) is part of a study that compares the practical comparisons of different energy concepts for highly efficient, ecological and economically operated multi-family dwellings. One goal here is to achieve the lowest possible energy and heating demand in the operation of the building. For this purpose, different variants were already planned and selected for the construction, such as heating system and building shell according to the latest research findings.
Post date: 17 Sep 2019
Type: Caso

The goal of the Perlita Project is to show a new path for low energy consumption buildings in Los Angeles and in Southern California through realistic, affordable and reproducible solutions.   The main focus was the energy efficiency. We followed the PassiveHouse standard path, which is the leading international low energy building standard with more than 85,000 buildingsaround the globe in all climate zones, to deliver ahigh level of comfort with very low energy consumption.  
Post date: 29 Ago 2019
Type: Caso

Description générale:   Situé sur un ancien site de Belgacom, devenu terrain en friche, le bâtiment dédié au durable s'élèvera sur deux étages le long de la rue Dieudonné Lefèvre. Au rez-de-chaussée, les ateliers (sur 5.000 m2) ; et à l'étage, les espaces liés aux incubateurs d'entreprises (sur 2.500 m2).   
Post date: 29 Ago 2019
Type: Caso

This new residential complex in Tirol, completed in 2018, is a passive house construction with 20 condominiums, 19 underground parking spaces and 8 carport spaces. The structure is U-shaped and is divided, due to the slope, in a basement with underground parking, a ground floor and 4 other above-ground floors.   The outstandingly low levels of energy demand and consequential CO2 emissions have made it achieve the Bronze status of the Austrian klimaaktiv criteria.  
Post date: 26 Jul 2019
Type: Caso

Unique view and idyllic location, this project in the heart of Vienna consists of 117 privately financed condos. Its planned completion is foreseen for 2019.   The building presents a promising living space in a prime location - right next to the Otto-Benesch-Park and the recreational area near the Wienerberg pond.   
Post date: 23 Jul 2019
Type: Caso

A more than 12,000 m² glass envelope covers all of the buildings in this further training academy. PV systems were integrated into the roof surfaces and the south-west surfaces of the glass envelope on the sides. The almost 3200 PV modules have a varying solar cell packing density.  
Post date: 6 Mayo 2019
Type: Caso

The book present exemplary selected projects carried out in the Trentino-Alto Adige region (Italy) exploring building-integrated photovoltaics (BIPV) systems (i.e. modules, construction system, energy systems). 18 case studies are presented analyzing three aspects of PV integration: aesthetic, energy and technology. Each case study provides information on decision-making, design process and lessons learnt, ilustrated with pictures and architectural details.  
Post date: 6 Mayo 2019
Type: Publication

In 2010, the energy efficiency of housing had been improving significantly in Lithuania over the previous ten years in part as a result of the JESSICA I program to implement energy efficiency renovations.  
Post date: 24 Oct 2018
Type: Caso

P2ENDURE promotes evidence-based innovative solutions for deep renovation based on prefabricated Plug-and-Play systems in combination with on-site robotic 3D-printing and Building Information Modeling (BIM), demonstrated and monitored at 10-real projects in 4 geo-clusters with EU-wide replication potentials. Among the project targets is that to improve the availability and performance of energy saving solutions for deep renovation and transformation of vacant, obsolete or sub-optimal public buildings into dwellings. The project provides Plug & Play solutions which are:
Post date: 30 Jul 2018
Type: Evento

Post date: 7 Jun 2018
Type: Caso