Very low energy buildings

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Array
Post date: 15 Jun 2009
Type: Evento

Post date: 15 Jun 2009
Type: Caso

Post date: 15 Jun 2009
Type: Caso

Post date: 15 Jun 2009
Type: Caso

Post date: 15 Jun 2009
Type: Caso

ECOSM in figure : Total surface area of the building : 1511 m2 Cost of construction : 2.1 millions euros or 1390 €/m2 42 photovoltaic membranes : 17.14 kWc LED lighting : 786 Watts Heat Pumps : 4 (inside the eco-sphere) 243 Wirecom technologies electronic cards 182 sensors : temperature, hygrometry, luminosity, rain, wind, pressure 312 actuators Construction and insulation of walls :
Post date: 15 Jun 2009
Type: Caso

The CHANGE project helps SMEs optimise their energy use by developing a European network of intelligent energy advisors at Chambers of Commerce and Industry (CCIs) and by kick-starting/enhancing concrete assistance to SMEs.
Post date: 15 Jun 2009
Type: Caso

Post date: 14 Jun 2009
Type: Enlace

Post date: 14 Jun 2009
Type: Enlace