none

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The goal of the Perlita Project is to show a new path for low energy consumption buildings in Los Angeles and in Southern California through realistic, affordable and reproducible solutions.   The main focus was the energy efficiency. We followed the PassiveHouse standard path, which is the leading international low energy building standard with more than 85,000 buildingsaround the globe in all climate zones, to deliver ahigh level of comfort with very low energy consumption.  
Post date: 29 Ago 2019
Type: Caso

Description générale:   Situé sur un ancien site de Belgacom, devenu terrain en friche, le bâtiment dédié au durable s'élèvera sur deux étages le long de la rue Dieudonné Lefèvre. Au rez-de-chaussée, les ateliers (sur 5.000 m2) ; et à l'étage, les espaces liés aux incubateurs d'entreprises (sur 2.500 m2).   
Post date: 29 Ago 2019
Type: Caso

This new residential complex in Tirol, completed in 2018, is a passive house construction with 20 condominiums, 19 underground parking spaces and 8 carport spaces. The structure is U-shaped and is divided, due to the slope, in a basement with underground parking, a ground floor and 4 other above-ground floors.   The outstandingly low levels of energy demand and consequential CO2 emissions have made it achieve the Bronze status of the Austrian klimaaktiv criteria.  
Post date: 26 Jul 2019
Type: Caso

Unique view and idyllic location, this project in the heart of Vienna consists of 117 privately financed condos. Its planned completion is foreseen for 2019.   The building presents a promising living space in a prime location - right next to the Otto-Benesch-Park and the recreational area near the Wienerberg pond.   
Post date: 23 Jul 2019
Type: Caso

This case study represents a rehabilitation and energy renovation of a 1970 condominium. It consists of a small joint ownership of 23 lots in Sevran (in Paris suburbs) as part of the "OPAH Quartier Rougemont" with the operator OZONE.  
Post date: 19 Jul 2019
Type: Caso

Large companies are looking to equip themselves with a bottom-up approach to foster environmental performance in buildings to complement the top-down policies available in their significant portfolios (certifications, ISO 50001, facility management progress plans, etc.).  
Post date: 12 Jul 2019
Type: Caso

This is the first block of housing certified in Spain built in 2017 under the Passivhaus standard, and therefore has a demand for heating below 15kWh / m2a, and a heating load of 10W / m2.   This implies that a floor of 75m2 will have a heating load of only 750W, so with a hair dryer there would be enough to heat two houses.   To achieve this the following principles have been applied:  
Post date: 1 Jul 2019
Type: Caso

El hotel Arima (2017) ha obtenido el precertificado Passivhaus que le ha otorgado la empresa Energiehaus el mes de abril del 2019.   Con este galardón, se honra el esfuerzo realizado por parte de la promotora CLIVING15 y de la constructora Miguel Imaz Constructores, para convertir un proyecto que ha empezado conforme el Código Técnico, en un hotel de referencia en eficiencia energética a nivel nacional.  
Post date: 26 Jun 2019
Type: Caso

Among the STUNNING case studies, we find the Torrelago district, which is an apartment block built between 1977-1981.   Torrelago district involves 31 private multi-property residential buildings (1488 dwellings) that were constructed in the 1970s–1980s, more than 140,000 m2 and 4000 residents involved.  
Post date: 17 Jun 2019
Type: Caso

This Norwegian demonstration building is a two-floor building with eight small dwellings in total, located at Haugerud in the city of Oslo. Haugerud is a suburb in the east of Oslo with housing developments and houses built around the metro station. This renovation is part of a Horizon 2020 project 4RinEU.  
Post date: 23 Mayo 2019
Type: Caso