Austria

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

In June 2017, Burghauptmannschaft Oesterreich had submitted a project proposal for Horizon 2020, which landed on the waiting list with more than 90% points achieved. Hardly anyone remembered it at the end of 2018...  
Post date: 8 Oct 2019
Type: Noticias

8th European Congress on the Use, Management and Conservation of Buildings of Historical Value: “Born in the Past – Used Today – Preserved for the Future“ Burghauptmannschaft Österreich invites you to the 7th European Congress on the Use, Management and Conservation of Buildings of Historical Value: “Born in the Past – Used Today – Preserved for the Future“ at Imperial Palace Vienna on 16 and 17 October 2018. Topic: Energy Efficiency and Historic Buildings - Contradiction or Reality?
Post date: 8 Oct 2019
Type: Evento

The climate emergency is one of the most talked about and vocalised issues the population of the Earth currently faces with climate strikes now being a weekly occurrence and with a regular spot on the 6 o'clock news, it's no surprise that mitigation against climate change is high on the policy agenda.  
Post date: 8 Oct 2019
Type: Noticias

PROtect traditional built HERITAGE Skills – PRO-Heritage According to the climate change and energy policy of the EU, each member state needed to identify and develop a series of energy efficient goals and regulations, of which buildings are a key element, in order to reach the set goals. However, Europe has numerous historic buildings, which need permanent maintenance and refurbishment in order to fulfil the requirements of sustainability and use.  
Post date: 7 Oct 2019
Type: Enlace

Horizon 2020 Energy Efficiency project SEFIPA ended with impressive results. It supported real estate funds with a total volume of EUR 6.7 billion to apply sustainability criteria for their buildings portfolio. 
Post date: 7 Oct 2019
Type: Noticias

The project (planned for completion in 2019) is part of a study that compares the practical comparisons of different energy concepts for highly efficient, ecological and economically operated multi-family dwellings. One goal here is to achieve the lowest possible energy and heating demand in the operation of the building. For this purpose, different variants were already planned and selected for the construction, such as heating system and building shell according to the latest research findings.
Post date: 17 Sep 2019
Type: Caso

This Deliverable has been prepared under Work Package 2 (Formulating recommendations on national energy policy priorities for 2050 and fostering multi – level cooperation and governance). It provides information about national long-term energy and climate policy priorities, indicates bottom-up recommendations on targets, priorities and actions for 2050 and sets recommendations for multi - level governance improvements in each project country.
Post date: 12 Sep 2019
Type: Publication

The 3-storey detached house was completed in 2019 and was built as a mixed construction (solid / wood).    The basis for the planning is an energy-efficient and ecological construction, which ensures a sustainable lifestyle with low energy consumption and associated minimum energy costs.    The heating of the object takes place via an air heat pump. The installation of a comfort ventilation ensures fresh, healthy air.  
Post date: 10 Sep 2019
Type: Caso

This new residential complex in Tirol, completed in 2018, is a passive house construction with 20 condominiums, 19 underground parking spaces and 8 carport spaces. The structure is U-shaped and is divided, due to the slope, in a basement with underground parking, a ground floor and 4 other above-ground floors.   The outstandingly low levels of energy demand and consequential CO2 emissions have made it achieve the Bronze status of the Austrian klimaaktiv criteria.  
Post date: 26 Jul 2019
Type: Caso

Unique view and idyllic location, this project in the heart of Vienna consists of 117 privately financed condos. Its planned completion is foreseen for 2019.   The building presents a promising living space in a prime location - right next to the Otto-Benesch-Park and the recreational area near the Wienerberg pond.   
Post date: 23 Jul 2019
Type: Caso