Practices

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Jessica II Fund for Multi-apartment Building Modernisation in Lithuania

Highlighted Case November 2018
Case Studies of the EU Energy Poverty Observatory (EPOV) showcase successfully implemented energy poverty measures in...
In 2010, the energy efficiency of housing had been improving significantly in Lithuania over the previous ten years in part...

Renovation of the THEODORE building

Highlighted Case October 2018
Project type : Renovation Building Type : Office building < 28m Construction Year : 2015 Delivery year : 2017 Climate...
  The renovation of the THEODORE building is in line with the desire of AG Real Estate to participate in...

Elobau production and offices buildings - Germany

When Elobau conducted a study for its new production building, one key consideration was its energy vision: that if possible, the new facility should rely entirely on renewable energy. The brief was not just to see if it would be possible...

Eisbärhaus units A & B- Germany

Built in 2019, the Eisbärhaus was designed as a passive building comprising two units. Building materials were selected according to guidelines provided by the Austrian environmental association Umweltverband Vorarlberger Gemeindehaus. All...

Aktiv-Stadthaus social housing in Speicherstraße - Germany

The Aktiv-Stadthaus in Frankfurt am Main is the first large apartment building in a city to be built according to the Efficiency House Plus standard. The first residents moved in during the summer of 2015. The aim of its innovative energy...

Timber-framed house in Alsace – France

This house is located in Schnersheim, a village of 750 inhabitants, 20 km away of the head of the Alsace Region, Strasbourg. The house is a former farm and is constructed on a light slope. The basement and two walls giving to the national...

Osramhuset (The Osram Building) - Danmark

The Osram Building was originally built in 1953 as an office and warehouse for A/S Dansk Osram, i.e. a lightbulb manufacturer. The building was the first prefabricated building in Copenhagen, and it was built in shock concrete or shavings...

Klostergebäude Kaiserstrasse - Austria

The building is a symmetrical structure with two wings, which frame the forecourt of the Lazaristenkirche. The north wing was the subject of renovation. It dates from the late "Gründerzeit" period of 1884-1918, was built in 1904 and...

New Logic III – “The Tube”, Netherlands

DOKVAST developed a sustainable and high-quality distribution centre for Rhenus Contract Logistics at the industrial area Het Laar in Tilburg. The distribution centre, named “The Tube”, consists of three linked compartments with mezzanine...

Farm house Trins

The renovation of the Mayrhof in Trins combines several best-practice solutions in one project. In particular, the use of a newly developed façade system and an extension using a house-in-house concept allow architectural and building...