The 10 houses of Hem are the first homes rehabilitated in France to zero energy and any form of consumption guaranteed for 25 years. Energiesprong is an initiative initiated in the Netherlands in 2013. Vilogia tested in France the first prototypes of this approach on 10 houses built in 1950 in Hem near Lille. Vilogia aims to rehabilitate 500 homes over 5 years using the same method. The Energiesprong method is as follows: using the current technological tools (digital and industrial method) to rehabilitate a dwelling in 3 weeks.  
Post date: 7 May 2020
Type: Spis

Date and time: 28 May 2020, 10:00-11.30 CET   Overview  
Post date: 4 May 2020
Type: Događanje

Klimaaktiv Silver *   The construction of the building was aimed, on the one hand, to offer affordable sustainable housing and on the other hand to plan an extension with quality of life and without any conflicts of use and in energy consumption.
Post date: 3 May 2020
Type: Spis

An important public building in the most populated city of Zagreb county, Velika Gorica, this kindergarten was in need of energy renovation as it was expensive to run and uncomfortable for its occupants.  Having become an eco-school, the management realised that energy renovation was essential to underpin the new ethos of the school.  
Post date: 30 Apr 2020
Type: Spis

Backed by its mission to protect the Pacific Northwest’s natural environment and promote healthy and sustainable ecosystems, the Bullitt Foundation wanted their new headquarters to be built to the highest level of sustainability. They also wanted the building to be a demonstration project that would set a new standard for developers, architects, engineers and contractors.  
Post date: 29 Apr 2020
Type: Spis

The Lycée pour Professions de Santé in Ettelbruck, now the largest wooden building in the Grand Duchy, is a pilot project. It is indeed the first Luxembourg public building with positive energy. It is also the first in Luxembourg to aim for a "Minergie-P- ECO" certification. In addition to the comfort of the occupants, which reaches its highest level thanks to this certification, it is also the ecological footprint of the building that has been at the centre of attention since the design phase.  
Post date: 19 Apr 2020
Type: Spis

When the new grammar school building was erected in Diedorf, an ‘integrated design process’ was applied, demonstrating that it is possible to plan innovatively and sustainably and still ensure that available resources are used economically and sparingly throughout the entire life cycle of a building.  
Post date: 17 Apr 2020
Type: Spis

Can a building produce more energy than it consumes, exclusively from renewable sources? Certainly! This is demonstrated by the experience of Casa SN (named after its owners Sara and Nicola Berlanda) which has recently become the first building in Europe - and Italy - to be certified under the Zero Energy standard of the International Living Future Institute (ILFI).  
Post date: 17 Apr 2020
Type: Vijesti

The Center for Sustainable Landscapes (CSL) is a 24,350-square-foot education, research and administration facility at Phipps Conservatory and Botanical Gardens, a public garden attraction in Pittsburgh, Pennsylvania, USA. Designed and built to generate all of its own energy while treating and reusing all water captured on-site, the first facility in the world to meet four of the world’s highest green construction standards- now adds the distinctive BREEAM Outstanding In-Use rating to its resume.  
Post date: 14 Apr 2020
Type: Spis

This 600 square-metre plot was used to erect a new service centre that would not only encompass a bank branch but also consultation rooms for customers and staff. Overall the building spans a total usable floor area of 1800 square metres. The energy consultant used dynamic computer simulations and local climate records to design the building and select materials.  
Post date: 14 Apr 2020
Type: Spis