Air conditioning, cooling, ventilation, air infiltration

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

EED

Post date: 21 Dec 2009
Type: Tool

This method is described in a small practical guidebook (40 pages). It includes three levels of inspections or diagnosis: - DIAGVENT 1: no measurements, only visual checking, for commissioning new installations. The main objective is to verify that the installed system is in accordance with the expected one.
Post date: 19 Dec 2009
Type: Publication

Post date: 18 Dec 2009
Type: Tool

Post date: 18 Dec 2009
Type: Tool

Post date: 18 Dec 2009
Type: Tool

Post date: 18 Dec 2009
Type: Tool

The German Ministry for Transport, Building and Urban Affairs contracted Fraunhofer-IBP in cooperation with the Federal Office for Building and Regional Planning and the company Megawatt to issue an energy certificate based on calculations with the standard DIN V 18599. The complex energy supply concept includes combined heat and power units based on biofuel, absorption cooling, seasonal heat and cold storages and connects via local district heating and cooling networks several parliamentary buildings.
Post date: 17 Dec 2009
Type: Spis

The EPC community has for mission statement to demonstrate the benefits of using Energy Performance Contracting and to stimulate the adoption of this building energy efficiency tool accross Europe.
Post date: 17 Dec 2009
Type: Topic

The German Ministry for Transport, Building and Urban Affairs contracted Fraunhofer-IBP in cooperation with the Federal Office for Building and Regional Planning and the company Megawatt to issue an energy certificate based on calculations with the standard DIN V 18599. The complex energy supply concept includes combined heat and power units based on biofuel, seasonal heat and cold storages and connects via local district heating and cooling networks several parliamentary buildings. The building was retrofitted between 1991 and 1999 according to the architectural plans of Sir Norman...
Post date: 16 Dec 2009
Type: Vijesti

Array
Post date: 13 Dec 2009
Type: Događanje