Public and non residential buildings

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

An important public building in the most populated city of Zagreb county, Velika Gorica, this kindergarten was in need of energy renovation as it was expensive to run and uncomfortable for its occupants.  Having become an eco-school, the management realised that energy renovation was essential to underpin the new ethos of the school.  
Post date: 30 Apr 2020
Type: Spis

The EBC Building Energy Codes Working Group (BECWG) is hosting a webinar on operational and construction issues related to energy use in buildings during the COVID-19 crisis. Presenters will discuss the safe operation of buildings and strategies to maintain healthy indoor air quality (IAQ), including guidance from ASHRAE and REHVA, as well as broader issues facing the design and construction industry, such as compliance checking and leveraging opportunities for virtual assessments.
Post date: 30 Apr 2020
Type: Događanje

Backed by its mission to protect the Pacific Northwest’s natural environment and promote healthy and sustainable ecosystems, the Bullitt Foundation wanted their new headquarters to be built to the highest level of sustainability. They also wanted the building to be a demonstration project that would set a new standard for developers, architects, engineers and contractors.  
Post date: 29 Apr 2020
Type: Spis

An important function of the built environment is providing a safe place for its inhabitants.  Edward Ng (Chinese University of Hong Kong) recalls the spread of SARS in Hong Kong and reflects on the public health lessons for the built environment. A process of preparation and management is vital for reducing present and future health risks. This is becoming evident in Hong Kong’s recent codes and regulations for urban design and buildings. Other cities can learn from this process.  
Post date: 29 Apr 2020
Type: Publication

As response to the coronavirus (COVID-19 or SARS-CoV-2) pandemic, REHVA experts drafted a guidance document on how to operate and use building services in areas with a coronavirus outbreak to prevent the spread of COVID-19 depending on HVAC or plumbing systems related factors.  
Post date: 28 Apr 2020
Type: Publication

Self-sufficient humidity to electricity Innovative Radiant Adsorption System Toward Net Zero Energy Buildings European technology and creativity for net-zero buildings  
Post date: 28 Apr 2020
Type: Poveznica

The EU, in light of the 2030 and 2050 energy and climate goals, has adopted an ambitious vision for the energy performance of its buildings among other measures. This is because the building sector still represents about 40% of energy consumption in the EU with the largest cost-effective savings potential. However, in order to meet this vision, the construction sector must be ready to deliver high-performance retrofits and nearly zero energy buildings. As in every field, this would require a number of qualified professionals and building workers.
Post date: 28 Apr 2020
Type: Vijesti

The modular project TEESCHOOLS is the last project within the Efficient Buildings Community to come to an end.  TEESCHOOLS has covered a long distance on the path for the decarbonisation of public building stock.  A new publication now collects and presents all the most important outcomes of this journey.  
Post date: 26 Apr 2020
Type: Publication

The Lycée pour Professions de Santé in Ettelbruck, now the largest wooden building in the Grand Duchy, is a pilot project. It is indeed the first Luxembourg public building with positive energy. It is also the first in Luxembourg to aim for a "Minergie-P- ECO" certification. In addition to the comfort of the occupants, which reaches its highest level thanks to this certification, it is also the ecological footprint of the building that has been at the centre of attention since the design phase.  
Post date: 19 Apr 2020
Type: Spis

When the new grammar school building was erected in Diedorf, an ‘integrated design process’ was applied, demonstrating that it is possible to plan innovatively and sustainably and still ensure that available resources are used economically and sparingly throughout the entire life cycle of a building.  
Post date: 17 Apr 2020
Type: Spis