2018

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Since the start of All Saints' Day 2017, students in Secondary 5 and 6 of the  College "Notre-Dame de bon secours" in Binche are the first in Belgium to take classes in a building isolated with straw and wooden frame.   A spacious, bright, and healthy pavilion has replaced a prefabricated sheet metal energy wastage. This pavilion is the first prefabricated school building made of wood, compressed straw and clay plaster in French-speaking Belgium.   
Post date: 8 Set 2019
Type: Caso

The building was built in 2018 and it hosts 1300 students in food and body-care professions. The floors develop a useful surface around 9,000 m² distributed in two wings flanking a central courtyard:   On the street side, the reception wing, of general and scientific education: The construction integrates the soft natural environmental technologies of the site with the will to be applied pedagogical support and lived of the sobriety for the energy transition.  
Post date: 19 Giu 2019
Type: Caso

After acquiring 2 hectares of parcels that were formerly composed of scrap yards, the L'OREAL Group's Research & Innovation site has built (2018) its new research laboratory, the L6, with a twofold objective: environmental excellence and employee well-being.   Chemists, biochemists or biomechanics will join this new building of 5,000 m² spread over three levels.  
Post date: 19 Giu 2019
Type: Caso

Scenia (phase II) is a new built collective residential complex, with 26 exclusive homes and garage with a total of 13,576 m2 located in one of the best areas of Zaragoza, Valdespartera-Montecanal with common garden area, pool and paddle court.  
Post date: 17 Giu 2019
Type: Caso