2018

Since the start of All Saints' Day 2017, students in Secondary 5 and 6 of the  College "Notre-Dame de bon secours" in Binche are the first in Belgium to take classes in a building isolated with straw and wooden frame.   A spacious, bright, and healthy pavilion has replaced a prefabricated sheet metal energy wastage. This pavilion is the first prefabricated school building made of wood, compressed straw and clay plaster in French-speaking Belgium.   
Post date: 8 Set 2019
Type: Caso

The building was built in 2018 and it hosts 1300 students in food and body-care professions. The floors develop a useful surface around 9,000 m² distributed in two wings flanking a central courtyard:   On the street side, the reception wing, of general and scientific education: The construction integrates the soft natural environmental technologies of the site with the will to be applied pedagogical support and lived of the sobriety for the energy transition.  
Post date: 19 Giu 2019
Type: Caso

After acquiring 2 hectares of parcels that were formerly composed of scrap yards, the L'OREAL Group's Research & Innovation site has built (2018) its new research laboratory, the L6, with a twofold objective: environmental excellence and employee well-being.   Chemists, biochemists or biomechanics will join this new building of 5,000 m² spread over three levels.  
Post date: 19 Giu 2019
Type: Caso

Scenia (phase II) is a new built collective residential complex, with 26 exclusive homes and garage with a total of 13,576 m2 located in one of the best areas of Zaragoza, Valdespartera-Montecanal with common garden area, pool and paddle court.  
Post date: 17 Giu 2019
Type: Caso