case studies

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Haugerudsenteret (Oslo, Norway) – Our first success story. Energy performance to be assessed The Norwegian demo case, located in Oslo, is the first example of a successful implementation of 4RinEU methodology. The renovation works took place in the second half of 2018 and lasted only eight weeks, during which the tenants kept living in their dwellings.
Post date: 23 Giu 2020
Type: News

The building is used as a residential, and the aim of the renovation has been the conservation of the ancient walls of the medieval castle, considering modern comfort standards with the target of achieving a building ad a high standard of energy efficiency, (i.e. the NZEB standard).  
Post date: 23 Giu 2020
Type: Caso

The contest was aimed at a BBC 2005 Effinergie consumption level. We have reached the Passive level for the Media Library.  
Post date: 9 Giu 2020
Type: Caso

HoHo Vienna is one of the tallest wooden buildings in the world and a lighthouse project for sustainable timber construction. Thanks to the level of thermal insulation, resource conservation, energy efficiency and sound insulation, it has been awarded with the certification LEED Gold and ÖGNB gold from the Austrian Society for Sustainable Buildings.  
Post date: 1 Giu 2020
Type: Caso

klimaaktiv bronze*   New apartment building completed in 2020. The entire residential complex is planned to be barrier-free. It is the new construction of a residential complex as passive house construction with 12 barrier-free or adaptable apartments, 4 of which are intended as serviceable apartments. There are also 13 underground parking spaces and 5 outdoor parking spaces.  
Post date: 7 Mag 2020
Type: Caso

The 10 houses of Hem are the first homes rehabilitated in France to zero energy and any form of consumption guaranteed for 25 years. Energiesprong is an initiative initiated in the Netherlands in 2013. Vilogia tested in France the first prototypes of this approach on 10 houses built in 1950 in Hem near Lille. Vilogia aims to rehabilitate 500 homes over 5 years using the same method. The Energiesprong method is as follows: using the current technological tools (digital and industrial method) to rehabilitate a dwelling in 3 weeks.  
Post date: 7 Mag 2020
Type: Caso

Date and time: 28 May 2020, 10:00-11.30 CET   Overview  
Post date: 4 Mag 2020
Type: Evento

Klimaaktiv Silver *   The construction of the building was aimed, on the one hand, to offer affordable sustainable housing and on the other hand to plan an extension with quality of life and without any conflicts of use and in energy consumption.
Post date: 3 Mag 2020
Type: Caso

An important public building in the most populated city of Zagreb county, Velika Gorica, this kindergarten was in need of energy renovation as it was expensive to run and uncomfortable for its occupants.  Having become an eco-school, the management realised that energy renovation was essential to underpin the new ethos of the school.  
Post date: 30 Apr 2020
Type: Caso

Backed by its mission to protect the Pacific Northwest’s natural environment and promote healthy and sustainable ecosystems, the Bullitt Foundation wanted their new headquarters to be built to the highest level of sustainability. They also wanted the building to be a demonstration project that would set a new standard for developers, architects, engineers and contractors.  
Post date: 29 Apr 2020
Type: Caso