none

This new residential complex in Tirol, completed in 2018, is a passive house construction with 20 condominiums, 19 underground parking spaces and 8 carport spaces. The structure is U-shaped and is divided, due to the slope, in a basement with underground parking, a ground floor and 4 other above-ground floors.   The outstandingly low levels of energy demand and consequential CO2 emissions have made it achieve the Bronze status of the Austrian klimaaktiv criteria.  
Post date: 26 Lug 2019
Type: Caso

Unique view and idyllic location, this project in the heart of Vienna consists of 117 privately financed condos. Its planned completion is foreseen for 2019.   The building presents a promising living space in a prime location - right next to the Otto-Benesch-Park and the recreational area near the Wienerberg pond.   
Post date: 23 Lug 2019
Type: Caso

This case study represents a rehabilitation and energy renovation of a 1970 condominium. It consists of a small joint ownership of 23 lots in Sevran (in Paris suburbs) as part of the "OPAH Quartier Rougemont" with the operator OZONE.  
Post date: 19 Lug 2019
Type: Caso

Large companies are looking to equip themselves with a bottom-up approach to foster environmental performance in buildings to complement the top-down policies available in their significant portfolios (certifications, ISO 50001, facility management progress plans, etc.).  
Post date: 12 Lug 2019
Type: Caso

This is the first block of housing certified in Spain built in 2017 under the Passivhaus standard, and therefore has a demand for heating below 15kWh / m2a, and a heating load of 10W / m2.   This implies that a floor of 75m2 will have a heating load of only 750W, so with a hair dryer there would be enough to heat two houses.   To achieve this the following principles have been applied:  
Post date: 1 Lug 2019
Type: Caso

El hotel Arima (2017) ha obtenido el precertificado Passivhaus que le ha otorgado la empresa Energiehaus el mes de abril del 2019.   Con este galardón, se honra el esfuerzo realizado por parte de la promotora CLIVING15 y de la constructora Miguel Imaz Constructores, para convertir un proyecto que ha empezado conforme el Código Técnico, en un hotel de referencia en eficiencia energética a nivel nacional.  
Post date: 26 Giu 2019
Type: Caso

Among the STUNNING case studies, we find the Torrelago district, which is an apartment block built between 1977-1981.   Torrelago district involves 31 private multi-property residential buildings (1488 dwellings) that were constructed in the 1970s–1980s, more than 140,000 m2 and 4000 residents involved.  
Post date: 17 Giu 2019
Type: Caso

This Norwegian demonstration building is a two-floor building with eight small dwellings in total, located at Haugerud in the city of Oslo. Haugerud is a suburb in the east of Oslo with housing developments and houses built around the metro station. This renovation is part of a Horizon 2020 project 4RinEU.  
Post date: 23 Mag 2019
Type: Caso

Situated on the Stonehouse peninsula, by the banks of the River Tamar, Number 3 Admirals Hard was built in the 1960s and comprises a shop on the ground floor and WARM's office, originally a flat, on the first floor. The extensive retrofit works included external wall insulation, cavity wall fill, floor insulation (between the office and the shop), roof insulation at rafter level, high levels of air tightness and high-performance triple-glazed windows, as well as a self-balancing MVHR system.  
Post date: 8 Mag 2019
Type: Caso

A more than 12,000 m² glass envelope covers all of the buildings in this further training academy. PV systems were integrated into the roof surfaces and the south-west surfaces of the glass envelope on the sides. The almost 3200 PV modules have a varying solar cell packing density.  
Post date: 6 Mag 2019
Type: Caso