El hotel Arima (2017) ha obtenido el precertificado Passivhaus que le ha otorgado la empresa Energiehaus el mes de abril del 2019.   Con este galardón, se honra el esfuerzo realizado por parte de la promotora CLIVING15 y de la constructora Miguel Imaz Constructores, para convertir un proyecto que ha empezado conforme el Código Técnico, en un hotel de referencia en eficiencia energética a nivel nacional.  
Post date: 26 Giu 2019
Type: Caso

Among the STUNNING case studies, we find the Torrelago district, which is an apartment block built between 1977-1981.   Torrelago district involves 31 private multi-property residential buildings (1488 dwellings) that were constructed in the 1970s–1980s, more than 140,000 m2 and 4000 residents involved.  
Post date: 17 Giu 2019
Type: Caso

This Norwegian demonstration building is a two-floor building with eight small dwellings in total, located at Haugerud in the city of Oslo. Haugerud is a suburb in the east of Oslo with housing developments and houses built around the metro station. This renovation is part of a Horizon 2020 project 4RinEU.  
Post date: 23 Mag 2019
Type: Caso

Situated on the Stonehouse peninsula, by the banks of the River Tamar, Number 3 Admirals Hard was built in the 1960s and comprises a shop on the ground floor and WARM's office, originally a flat, on the first floor. The extensive retrofit works included external wall insulation, cavity wall fill, floor insulation (between the office and the shop), roof insulation at rafter level, high levels of air tightness and high-performance triple-glazed windows, as well as a self-balancing MVHR system.  
Post date: 8 Mag 2019
Type: Caso

A more than 12,000 m² glass envelope covers all of the buildings in this further training academy. PV systems were integrated into the roof surfaces and the south-west surfaces of the glass envelope on the sides. The almost 3200 PV modules have a varying solar cell packing density.  
Post date: 6 Mag 2019
Type: Caso

The A2PBEER research project focused on “energy efficient retrofitting” methodology for public buildings. Within the context of this project it has been developed an initial systemic energy efficient buildings’ retrofitting methodology for the three demonstration sites with the intention to provide a retrofitting methodology to be replicated into Public Buildings in Europe. This will take advantage of synergies derived from interventions at the district levels.  
Post date: 11 Apr 2019
Type: Caso

The A2PBEER research project focused on “energy efficient retrofitting” methodology for public buildings. Within the context of this project it has been developed an initial systemic energy efficient buildings’ retrofitting methodology for the three demonstration sites with the intention to provide a retrofitting methodology to be replicated into Public Buildings in Europe. This will take advantage of synergies derived from interventions at the district levels.  
Post date: 11 Apr 2019
Type: Caso

The A2PBEER research project focused on “energy efficient retrofitting” methodology for public buildings. Within the context of this project it has been developed an initial systemic energy efficient buildings’ retrofitting methodology for the three demonstration sites with the intention to provide a retrofitting methodology to be replicated into Public Buildings in Europe. This will take advantage of synergies derived from interventions at the district levels.  
Post date: 11 Apr 2019
Type: Caso

In the framework of the PV-ESTIA project, the performance of the proposed PV+storage Innovative Management Scheme will be evaluated under real-field conditions. Pilot installations will be selected with the aim to examine if and how the size of the Energy Storage Systems and the different geographical conditions affect the performance of the innovative management scheme. The pilot installations include the following cities:
Post date: 4 Apr 2019
Type: Caso

The developers and architects of this project have set very high goals. With the Bolueta building, they wanted to set a new Passive House record and at the same time ensure the quality of the building through certification. Bolueta in the Spanish city of Bilbao is now the tallest Passive House building in the world. The recently issued certificate is proof of its highly energy efficient Passive House Standard construction.  
Post date: 28 Mar 2019
Type: Caso