On-site renewable energy sources

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Webinar 13: Industrial heat pumps for a greener European industry   Date: 30.09.2020Time: 10:10 – 11:22 am CEST   Speakers:
Post date: 4 aug 2020
Type: Evenement

IEA EBC Annex 75 Cost-effective Building Renovation at District Level Combining Energy Efficiency & Renewables: 6th Expert Meeting   September 22-24, 2020 Remote Meeting, in replacement of the foreseen live meeting Zurich Switzerland   The EBC Research Programme  
Post date: 3 aug 2020
Type: Evenement

In this booklet, the results of the ZERO-PLUS are described emphasizing on the four case studies (UK, Italy, France, Cyprus), which all have now been constructed, commissioned and occupied. The case studies are in the monitoring phase where data about their energy environmental performance are being collected. These data will be used for the verification of the settlements’ performance.
Post date: 31 jul 2020
Type: Publication

The settlements are located in Cyprus, France, Italy and the UK and consist of different typologies of residential buildings. They are now occupied and a monitoring phase is ongoing to collect data on their energy and environmental performances and verify the ZERO-PLUS solutions.  
Post date: 31 jul 2020
Type: Nieuws

The building has been nominated for the BREEAM Energy award 2020 and it is a very ambitious construction in the city centre of Warsaw. The location was originally occupied by a block of flats of 10 floors built in 1960, that was demolished in 2017, in order to enable the construction of the new complex, more in line with the new needs of the Warsaw’s office market.  
Post date: 31 jul 2020
Type: Geval

The new Central Building of Leuphana University represents an exemplary sustainable campus. It is part of the "Climate-neutral campus" project, which was nominated for the German sustainability award. The building concept and design started from an idea elaborated from a group of students within a university seminar with the architect Daniel Libeskind.    
Post date: 30 jul 2020
Type: Geval

Apple has released a 10-year roadmap to ensure that every device it produces has a net-zero climate impact by 2030, as part of its plans to become carbon neutral. The company announced today its commitment to achieving a net-zero carbon footprint across its product life cycles and manufacturing supply chains in 10 years' time. Apple said its global corporate operations are already carbon neutral but plans for its entire business, including all of its devices, to have a net-zero climate impact by 2030.
Post date: 30 jul 2020
Type: Nieuws

The website of the Renovate Europe Campaign presents a huge number of building renovation best practices across Europe. The scope is to provide a set of exemplary case studies to be further replicated in order to boost the building renovation rates among the EU Member States towards the reduction of 80% of energy demand by 2050.  
Post date: 28 jul 2020
Type: Tool

Called Sport'Co, the Beaucouzé sports complex (49) opened its doors in early March 2019. In many ways, this positive-energy public school illustrates the right balance between fundamental values and innovative ideas. While meeting the functional requirements of a structure dedicated to team sports, it is characterized by exemplary technical and economic performances:
Post date: 28 jul 2020
Type: Geval

The renovation of the residential complex of Via Passeggiata dei Castani is one of the interventions developed within the FP7 Smart City project SINFONIA and has been concluded at the beginning of 2019.   The area is located in the east side of the city of Bolzano, under a mountain and the complex has been build in the ‘90ies. The complex is owned by the Municipality of Bolzano and it is composed by two buildings, that have 72 apartments distributed by four staircases for a total surface of 7456 m2.
Post date: 28 jul 2020
Type: Geval