Heat Pumps in buildings

EFH Plattner – Mieming (Austria)

The 3-storey detached house was completed in 2019 and was built as a mixed construction (solid / wood).    The basis for the planning is an energy-efficient and ecological construction, which ensures a sustainable lifestyle with low energy...

Passivhaus residential case: #29Soto (Navarra/Spain)

This is the first block of housing certified in Spain built in 2017 under the Passivhaus standard, and therefore has a demand for heating below 15kWh / m2a, and a heating load of 10W / m2.   This implies that a floor of 75m2 will have a heating load...

EFH Plattner – Mieming (Austria)

The 3-storey detached house was completed in 2019 and was built as a mixed construction (solid / wood).    The basis for the planning is an energy-efficient and ecological construction, which ensures a sustainable lifestyle with low energy...

Passivhaus residential case: #29Soto (Navarra/Spain)

This is the first block of housing certified in Spain built in 2017 under the Passivhaus standard, and therefore has a demand for heating below 15kWh / m2a, and a heating load of 10W / m2.   This implies that a floor of 75m2 will have a...

Søreide primary school: Norway

The school was built in 2012/13 as a public private partnership. The main energy related targets were to achieve passive house standard, to use prefabricated timber facades and renewable energy sources. The building should reach high...

Solid Sorption System for Cooling in Tri-generation (SOCOOL) - Project Fact Sheet - Italy

Solar Prism - Renovated townhouse

Energy: Solar thermal collectors use the sun’s energy to heat water for consumption and space heating. In average 2 m² of solar thermal panels supply sufficient hot water for 2 person’s daily use. Integrated in the prism...

Alternative power First National to hook up 4 fuel cells for electricity