Practices

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Quality Installation / Quality Maintenance Sensitivity Studies- Executive Summary

Share this Post:

IEA Technology Collaboration Programme on Heat Pumping Technologies - Annex 36 - Quality installation / quality maintenance sensitivity studies - Executive Summary

 

It is recognised that residential and commercial heat pump equipment experience significant “in-field” performance loss (i.e., capacity and efficiency) depending on how the components are sized, matched, installed, and maintained. International Energy Agency (IEA) Annex 36 evaluated how deficiencies in these areas cause heat pumps to perform inefficiently and hence waste energy. Some investigations (France and UK) included field tests and assessments. Other efforts included laboratory (France, UK, US) and/or modelling work (France, UK, US), and statistical analyses of large failure databases (Sweden). The outcome from this Annex activity clearly identifies that poorly installed and/or maintained heat pumps operate inefficiently and waste energy compared to their “as-designed” potential. Additionally, it is clear that small faults for a given field-observed practice are significant, that some attribute deviations (in various equipment applications and geographical locations) have a larger impact than others, and that multiple faults or deviations have a cumulative impact on heat pump performance.