French

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

Mercado del Val is an iron market located within the old town of Valladolid. Its construction was completed in 1882. The rectangular floor plan is 120 meters long times 19 meters wide, with chamfered corners. It had stones for foundations and plinth and iron for the other elements. Natural ventilation was performed through openings covered by blinds of iron sheets.  
Post date: 20 lut 2020
Type: Sprawa

The farmhouse was built in 1646 in log construction and was home of the painter Angelika Kaufmann. The living part of the house has been restored in 2008 and the affiliated barn was rebuild in 2013. The traditional renovation of the front building was done in the same architectural style as the existing.  
Post date: 19 lut 2020
Type: Sprawa

BIM for Energy Efficiency in the Public sector About the project  
Post date: 12 lut 2020
Type: Odnośnik

Minimising Energy Consumption for Green Buildings respecting present uses and public needs About the project  
Post date: 12 lut 2020
Type: Odnośnik

The SMARTER Finance for Families H2020 project intends to replicate the success of the Green Homes/ Green Mortgages (GH/GM) programme initiated by the Romanian Green Building Council (RoGBC). By the beginning of 2019, the Romanian program had signed agreements with 25 investors to build more than 6,500 housing units in Romania meeting strict green standards.
Post date: 3 lut 2020
Type: Aktualności

This house is located in Schnersheim, a village of 750 inhabitants, 20 km away of the head of the Alsace Region, Strasbourg. The house is a former farm and is constructed on a light slope. The basement and two walls giving to the national road are in rubbles of sandstone and limestone. The storeys are timber-framed, filled with cob or hand-made bricks produced on site. It has a heated area of 350 m² on two storeys. The basement and the attic are not heated.
Post date: 21 sty 2020
Type: Sprawa

The building is a symmetrical structure with two wings, which frame the forecourt of the Lazaristenkirche. The north wing was the subject of renovation. It dates from the late "Gründerzeit" period of 1884-1918, was built in 1904 and designed by architect Cajetan Miserowsky. The renovated building is located on the north side and has a predominantly south-facing orientation of the habitable rooms. The north side to the adjacent Sophienspital is a closed firewall. The narrow side to the west faces the private garden.  
Post date: 16 sty 2020
Type: Sprawa

Why come to MIPIM? Exhibition: With 22,000 m² exhibition space, MIPIM is the premier real estate event expo to discover opportunities and meet key international stakeholders.   Conferences: A leading programme of 130+ conference sessions providing expert insight into key sectors and property hotspots.  
Post date: 15 sty 2020
Type: Termin

BATIBOUW is always the right answer whether you’re constructing, renovating or changing your interior design. Before you come, find a selection of products and suppliers online, meet them at BATIBOUW in real life, listen to the advice of professionals and then make your decision.   THEMAROUTES / PARCOURS THÉMATIQUES / Ecology and Innovation   L’écologie et la recherche permanente d’innovations sont au centre de vos préoccupations !
Post date: 6 sty 2020
Type: Termin

Acquis d’apprentissage   Au terme de ce module, vous serez capables :  
Post date: 20 gru 2019
Type: Termin