Building Energy Management System (BEMS)

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The renovation project "Paint it Green" was undertaken by the owner company CoRI - Coating Research Institute after identifying two important concepts: the need for more space as well as the modernization of the company image. Focusing on these issues, the objective established was to create a building designed in an intelligent and thoughtful way combined with the aspects of being high-tech and durable.  
Post date: 2 sie 2017
Type: Sprawa

PERFORMER project started in September 2013 and after nearly 48 months, the team is close to delivering an innovative solution which aims to close the energy gap by facilitating the identification and targeting of a range of energy management opportunities.  
Post date: 10 lip 2017
Type: Aktualności

“Energy Efficient Ventilated Façades for Optimal Adaptability and Heat Exchange enabling low energy architectural concepts for the refurbishment of existing buildings.”  
Post date: 3 lip 2017
Type: Aktualności

Optimising Building Performance with Energy Analytics   Did you know that buildings tend to consume between 1.5 and 2.5 times the amount of energy originally predicted by their designers?  This alarming statistic is known as the building energy performance gap - a problem that energy managers and facility managers around the world have made it their mission to tackle.  
Post date: 28 cze 2017
Type: Publication

Το Energy Efficiency Conference 2017, που θα διεξαχθεί στην Αθήνα στις 29 Σεπτεμβρίου,  έχει ως στόχο την ανάδειξη των πιο αποτελεσματικών μεθόδων που εφαρμόστηκαν από κορυφαίες εταιρίες για να βελτιώσουν την ενεργειακή τους απόδοση, σε πολλαπλούς τομείς και διαδικασίες (παραγωγή, κτήρια, εσωτερικές λειτουργίες, υπηρεσίες).
Post date: 26 cze 2017
Type: Termin

The EU funded BRESAER Project (BREakthrough Solutions for Adaptable Envelopes in building Refurbishment) aims to develop and demonstrate an innovative envelope system that uses cost-effective, adaptable solutions for building refurbishment. It combines active and passive components, integrating them into a lightweight structural mesh.   The innovative solutions developed by the project include:  
Post date: 20 cze 2017
Type: Odnośnik

The nexus of energy management and control   Combining real-time energy monitoring and analytics with equipment performance and control means your building is fully optimized. But what are the tools, strategies and best practices needed to get there?   Join the founders of DEXMA and BuildPulse to learn:
Post date: 13 cze 2017
Type: Termin

Beyond Energy Efficiency: A Guide to Advanced Demand-Side Management Applications   How can energy services companies (ESCOs) get in on the demand response action? Their first step is to become demand-side management (DSM) enabled beyond energy efficiency. Not only do Demand-Side Management applications contribute to environmental sustainability objectives, but they can also offer unprecedented opportunities for the buildings sector to reap multiple economic benefits beyond energy efficiency.  
Post date: 18 Maj 2017
Type: Publication

15th Webinar: Dynamic, flexible and human-centric – Innovation towards smart energy management presented by NUS  
Post date: 17 Maj 2017
Type: Aktualności

  Add Value with Advanced Demand-Side Management   Demand Side Management (DSM) is evolving fast. Abundant new techniques and technologies are now available for application in buildings: HVAC optimisation, integrating on-site renewables, especially solar generation... and of course, huge leaps forward in Demand Response (DR). In the upcoming free online session on 30 May, DEXMA R&D Director Miguel Cruz will discuss:
Post date: 4 Maj 2017
Type: Termin