Building Energy Management System (BEMS)

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The CONCERTO Initiative of the European Commission, DG Energy, has co-funded 58 cities and communities in 22 projects and 23 countries. The initiative has started in 2005 and will last until 2014. The projects are role models for energy efficiency in buildings and communities.To read more about the CONCERTO Initiative, please click here.
Post date: 15 lut 2013
Type: Aktualności

Rising energy prices are making the generation of solar power for personal use increasingly attractive for homeowners in economic terms. In order to ensure, however, that the yield from the homeowner’s own photovoltaic system is available around the clock, the energy produced must be initially stored on site before being subsequently utilised in an efficiently and intelligently controlled fashion.
Post date: 10 paź 2012
Type: Aktualności

 
Post date: 30 Maj 2012
Type: Sprawa

As part of the ICT PSP programme of the European Commission Competitiveness and Innovation Programme, the eSESH project aims to design, develop and pilot new solutions to enable sustained reductions in energy consumption across European social housing.
Post date: 20 mar 2012
Type: Odnośnik

Here is a brief summary of what some of the projects presented:Pebble Project:   Visitors were able to interact with a scale-model of a neighbourhood (buildings and homes) equipped with real sensors and actuators, an interactive game guided visitors to make control decisions in order to save energy.SMARTCODE Project:  There was a house represented by its real devices (e.g. a washing machine and a refrigerator) connected via LED stripes to illustrate the flow of energy.
Post date: 20 mar 2012
Type: Aktualności

PENAM Bakery is one of the main bakeries in the Czech Republic.Initial situation:1. Energy consumption before renovation:55 900 GJ/year heat consumption17 270 MWh/year natural gas34 200 EUR/year operational costs2. Long time needed reconstruction of the old steam boiler-room3. Inefficient heating systems4. Special focus on the process steamGoals of building owner:
Post date: 22 gru 2011
Type: Sprawa

Array
Post date: 28 paź 2011
Type: Termin