Nearly zero-energy buildings

Heat pumps in Arnhem, the Netherlands

The European Commission aims to analyse the competitiveness of the European heating and cooling industry. Four case studies of successful and competitive deployment of heating and cooling solutions at a city level from selected organizations support...

Buhnici House - Premium Passive House Certified 2018

Este prima casă pasivă premium din România și în top 10 din lume, este o casă construită de la buldozer la întrerupător în mai puțin de 7 luni, este o casă cu materiale și tehnologie de rachete spațiale în ea, este automatizată complet și înțesată...

Heat pumps in Arnhem, the Netherlands

The European Commission aims to analyse the competitiveness of the European heating and cooling industry. Four case studies of successful and competitive deployment of heating and cooling solutions at a city level from selected...

Buhnici House - Premium Passive House Certified 2018

Este prima casă pasivă premium din România și în top 10 din lume, este o casă construită de la buldozer la întrerupător în mai puțin de 7 luni, este o casă cu materiale și tehnologie de rachete spațiale în ea, este automatizată complet și...

URMA de Bruay: residential building for university student

The building was built in 2018 and it hosts 1300 students in food and body-care professions. The floors develop a useful surface around 9,000 m² distributed in two wings flanking a central courtyard:   On the street side, the reception...

L6: The Energy and Positive Water Laboratory

After acquiring 2 hectares of parcels that were formerly composed of scrap yards, the L'OREAL Group's Research & Innovation site has built (2018) its new research laboratory, the L6, with a twofold objective: environmental excellence...

PV-ESTIA – an Interreg Balkan-Med project transforming buildings into a controllable energy source

In the framework of the PV-ESTIA project, the performance of the proposed PV+storage Innovative Management Scheme will be evaluated under real-field conditions. Pilot installations will be selected with the aim to examine if and how the...

OXIGEN OFFICE BUILDING

The Oxygen Office Building project, ideally located in the city of Brussels between the Royal Park and the Squares District, and between the Arts-Loi and Maelbeek metro stations, aimed the construction of a new low footprint office...

Rannaliiva in Vöru: building retrofitting during the RenoZEB Project

Project name: Rannaliiva Location: Vöru/Estonia, Liiva 26a Owner: Apartment association “Rannaliiva” Built in: late '80s   Construction characteristics:...

Sans-Souci project, Brussels, Belgium

The Sans-Souci project is remarkable for its scope and for its scale of intervention: the plot is about 300 meters long and 100 meters wide, which is equivalent to the area of 3 classical-small-size city blocks of the Brussels.   The...