Residential buildings

MFH Wolfurt House A (wood) - Austria

The project (planned for completion in 2019) is part of a study that compares the practical comparisons of different energy concepts for highly efficient, ecological and economically operated multi-family dwellings. One goal here is to achieve the...

EFH Plattner – Mieming (Austria)

The 3-storey detached house was completed in 2019 and was built as a mixed construction (solid / wood).    The basis for the planning is an energy-efficient and ecological construction, which ensures a sustainable lifestyle with low energy...

MFH Wolfurt House A (wood) - Austria

The project (planned for completion in 2019) is part of a study that compares the practical comparisons of different energy concepts for highly efficient, ecological and economically operated multi-family dwellings. One goal here is to...

EFH Plattner – Mieming (Austria)

The 3-storey detached house was completed in 2019 and was built as a mixed construction (solid / wood).    The basis for the planning is an energy-efficient and ecological construction, which ensures a sustainable lifestyle with low energy...

Perlita Passive house

The goal of the Perlita Project is to show a new path for low energy consumption buildings in Los Angeles and in Southern California through realistic, affordable and reproducible solutions.   The main focus was the energy...

Tivoli Greencity- Greenbizz

Description générale:   Situé sur un ancien site de Belgacom, devenu terrain en friche, le bâtiment dédié au durable s'élèvera sur deux étages le long de la rue Dieudonné Lefèvre. Au rez-de-chaussée, les ateliers (sur 5.000 m2) ; et à l...

NHT - Burgeck - JE29E (Jenbach -Austria)

This new residential complex in Tirol, completed in 2018, is a passive house construction with 20 condominiums, 19 underground parking spaces and 8 carport spaces. The structure is U-shaped and is divided, due to the slope, in a basement...

HOCHH(IN)AUS

Unique view and idyllic location, this project in the heart of Vienna consists of 117 privately financed condos. Its planned completion is foreseen for 2019.   The building presents a promising living space in a prime location - right next...

Hélène Boucher co-ownership in Sevran

This case study represents a rehabilitation and energy renovation of a 1970 condominium. It consists of a small joint ownership of 23 lots in Sevran (in Paris suburbs) as part of the "OPAH Quartier Rougemont" with the operator OZONE.   The...

Passivhaus residential case: #29Soto (Navarra/Spain)

This is the first block of housing certified in Spain built in 2017 under the Passivhaus standard, and therefore has a demand for heating below 15kWh / m2a, and a heating load of 10W / m2.   This implies that a floor of 75m2 will have a...