Practices

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

NHT - Burgeck - JE29E (Jenbach -Austria)

Share this Post:

This new residential complex in Tirol, completed in 2018, is a passive house construction with 20 condominiums, 19 underground parking spaces and 8 carport spaces. The structure is U-shaped and is divided, due to the slope, in a basement with underground parking, a ground floor and 4 other above-ground floors.

 

The outstandingly low levels of energy demand and consequential CO2 emissions have made it achieve the Bronze status of the Austrian klimaaktiv criteria.

 

BUILDING DETAILS 

Method of construction: Concrete Structures

Number of residential units: 20

Number of floors: 5

Cond. Gross floor area: 2091 m²

Usable area: 1378.1 m²

Heating system space heating: heat pump

Heating system hot water: electricity

 

  

PLANNING AND EXECUTION 

At least 2 infrastructures at 1.000 m: Yes

energy monitoring: Yes

Blower Door Test (n50 value): 0.35 h -1

 

 

ENERGY AND SUPPLY 

Energy data calculated according to OIB guideline 6 - 2015

Heating demand: 21.2 kWh / m² 

Primary energy demand: 79.7 kWh / m² 

CO 2 emissions: 11.5 kgCO 2 / m² 

 

 

BUILDING MATERIALS AND CONSTRUCTION

HFC-free insulating materials and mounting foams: Yes

 

 

COMFORT AND INDOOR AIR QUALITY 

Proof of summer suitability: Yes

Room air measurement VOC: 470 μg / m³

Room air measurement formaldehyde: 0.0082 mg / m³

Award labels

Available link languages