Czech Republic

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The re-building of “Green” embassies started in the 1990’s. Per President Obama’s Green initiatives:
Post date: 3 Mai 2010
Type: Știri

Post date: 14 Apr 2010
Type: Tool

The categories and the respective award winners are as follows: Most efficient new building – University library in Split Most efficient refurbishment – Office building HEP DP Elektra Koprivnica Best integrated design and energy concept – Phoenix Plaza Most innovative concept – Auto camp Politin Best integrated design with replication potential – Multiresidential buildings with business units Kature Best Endorser - HEP ESCO d.o.o.
Post date: 11 Mar 2010
Type: Știri

Local and regional capacity-building will be achieved through national online-help desks, frequent training events for local authorities, companies, and multipliers, as well as consultancy for applying and advancing EPC-standard procedures and instruments in concrete pilot projects. The promotional campaign will imply the integration of EPC issues in national trade fairs and the high-profile annual awarding events of the “European Energy Service Award”.
Post date: 19 Feb 2010
Type: Legătură

This year the European Energy Service Award will be bestowed for the fifth time. Since 2005 outstanding efforts and achievements for the development and success of energy services for energy efficiency in Europe are honoured. The award is offered in five categories:
Post date: 15 Feb 2010
Type: Știri

NKN

Post date: 12 Feb 2010
Type: Tool

Post date: 5 Feb 2010
Type: Tool

By addressing all aspects simultaneously, ESP-r allows the designer to explore the complex relationships between a building's form, fabric, air flow, plant and control. ESP-r is based on a finite volume, conservation approach in which a problem (specified in terms of geometry, construction, operation, leakage distribution, etc.) is transformed into a set of conservation equations (for energy, mass, momentum, etc.) which are then integrated at successive time-steps in response to climate, occupant and control system influences.
Post date: 5 Feb 2010
Type: Tool

Post date: 5 Feb 2010
Type: Tool