energy refurbishment / renovation / retrofitting

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

European leaders agreed in December that Europe would adopt a net-zero emission target for 2050 which would be put into legislation in March of this year. The European Commission issued a list of initiatives to respond to the ambitious goal of reaching carbon neutrality for all. This includes a "renovation wave" whose details will be clarified at the end of 2020.  
Post date: 3 Feb 2020
Type: Știri

The first Work Package (WP1) of the Horizon 2020 project BIM4Ren has been concluded. The main milestone achieved at this stage is the completion of the definition of the “Overall framework for a digital driven Integrated Design and Delivery Solutions (IDDS) ready BIM based renovation process”. This framework also covers the specifications developed for the integration of tools & services in the BIM4REN digitalized renovation workflows.  
Post date: 27 Ian 2020
Type: Publication

This house is located in Schnersheim, a village of 750 inhabitants, 20 km away of the head of the Alsace Region, Strasbourg. The house is a former farm and is constructed on a light slope. The basement and two walls giving to the national road are in rubbles of sandstone and limestone. The storeys are timber-framed, filled with cob or hand-made bricks produced on site. It has a heated area of 350 m² on two storeys. The basement and the attic are not heated.
Post date: 21 Ian 2020
Type: Caz

The Osram Building was originally built in 1953 as an office and warehouse for A/S Dansk Osram, i.e. a lightbulb manufacturer. The building was the first prefabricated building in Copenhagen, and it was built in shock concrete or shavings, as it is also called. The construction method was developed in Holland, and in involves includes powerfully shaking the concrete. The elements hereby get a very close and uniform structure.
Post date: 16 Ian 2020
Type: Caz

The building is a symmetrical structure with two wings, which frame the forecourt of the Lazaristenkirche. The north wing was the subject of renovation. It dates from the late "Gründerzeit" period of 1884-1918, was built in 1904 and designed by architect Cajetan Miserowsky. The renovated building is located on the north side and has a predominantly south-facing orientation of the habitable rooms. The north side to the adjacent Sophienspital is a closed firewall. The narrow side to the west faces the private garden.  
Post date: 16 Ian 2020
Type: Caz

The objective of the Horizon 2020 RenOnBill project is to scale up investments towards deep energy renovations of residential buildings, by promoting the development and implementation of on-bill schemes, based on the cooperation between energy utilities and financial institutions. On-bill schemes are a method of financing energy renovation investments in buildings that draws on utility bills as repayment vehicle.  
Post date: 15 Ian 2020
Type: Publication

The EU Energy Efficiency Directive requires Member States to submit long-term strategies for mobilising investment in the renovation of building stock within their National Energy Efficiency Plans. Recent changes to the Energy Performance of Buildings Directive (EPBD) require the adoption of long-term renovation strategies as part of the National Energy and Climate Plans. The amended EPBD shows a clearer path towards achieving low- and zero-emission building stock in the EU by 2050, underpinned by national roadmaps and public and private investment.  
Post date: 14 Ian 2020
Type: Știri

BPIE's latest report, published within the Horizon 2020 project BUILD UPON2, identifies synergies between between Sustainable Energy and Climate Action Plans (SECAPs) and Long Term Renovation Strategies (LTRS), and suggests how local renovation initiatives can be incorporated in LTRS drafting and implementation.  
Post date: 10 Ian 2020
Type: Publication

Tuesday 10 March 2020, Sofia | 14:00 - 17:30 Sofia time (EET)   HOTEL BALKAN (city centre) | 5 Sveta Nedelya Square | 1000 Sofia| Bulgaria  
Post date: 7 Ian 2020
Type: Event

The 4RinEU project is developing technological products, software tools, and methodologies, which offer innovative advantages and solutions to needs in the framework of building renovations and energy retrofits.  
Post date: 20 Dec 2019
Type: Știri