The building, designed by Ruben Muedra and developed by IDAI NATURE as their new headquarters, won the BUILD Sustainable Building "Excellence Award for Sustainable Architectural Design".   It has been completed in 2018 and it is located in the town of La Pobla de Vallbona in Valencia,where the main challenge was to meet the limiting cooling demands required for Passivhaus certification, in a warm climate and in a high internal gain building.  
Post date: 15 Oct 2020
Type: Caz

The administration building of the “Dachverbandes der öster. Sozialversicherung”in Wien, built at the end of the Seventies, has recently undergone a general renovation.  
Post date: 15 Oct 2020
Type: Caz

The building is an office of the company Thales Communications & Security in Bordeaux Mérignac completed in 2017. Designed by the architect Jean-Philippe Le Covec to improve the performance and well-being of its occupants, the campus is composed by nine buildings in the heart of a landscaped park. The architect imagined at the entrance of the site, an entire building dedicated to the reception and services with a restaurant, a business center, a space dedicated to the works council, a conciergerie , a showroom and many meeting rooms.
Post date: 25 Sep 2020
Type: Caz

REMOURBAN is a large-scale demonstration project, whose objective is to accelerate urban transformation towards the concept of smart city taking into account all aspects of sustainability. The demonstration addresses a holistic intervention in Valladolid (Spain), well balanced in terms of actions on energy, mobility and ICT, which is monitored and properly evaluated.
Post date: 17 Sep 2020
Type: Caz

In the district of Statz in Mühlbachl, the local social housing agency implemented a residential project with three energy efficient buildings with 26 apartments and an overall surface of around 1270 m2, that reached the level klimaaktiv gold, the highest one according to the local energy standard.  
Post date: 9 Sep 2020
Type: Caz

The estimated average gap between calculated and actual energy performance of the European building stock is 25% for energy performance and 1.5% for comfort performance (as scored by building occupants). Comprehensive research has shown that poorly commissioned and operated building management systems are often responsible for this gap, generally caused by the lack of appropriate and coherent Quality Management Systems (QMS) for building performance.  
Post date: 24 Aug 2020
Type: Caz

The case is one of the demonstration sites where the technologies developed within the H2020 project BUILDHEAT have been installed. The building is a large multifamily house in a small quarter in the outskirts of Zaragoza. It has 53 dwellings of two main sizes (i.e. 85 m² and 55 m²) distributed in 5 staircases on 4 floors. The building was constructed in 1988, is owned by Zaragoza Vivienda, the social housing Agency of Zaragoza, and is used for sheltered housing.  
Post date: 20 Aug 2020
Type: Caz

This hard-stone elementary school is located in Mulhouse in the Alsace region (north-eastern France), near the border with Germany. It is a listed building, since it was built in XXVIII sec as a spinning factory at a time which Mulhouse had an active textile industry and became a school in 1870. It has recently been retrofitted with a project balanced between low energy consumption and heritage preservation, with the availability of a constraint budget.  
Post date: 6 Iul 2020
Type: Caz

The building "L'Etape" was built in the early 1960s in the city of Charity sur Loire. It is a social housing building and the renovation aims to create spaces for temporary houses, training and short-term activities organized by the municipality.   The existing building presents a rectangular form on 4 levels and a total floor area of around 502m².  
Post date: 2 Iul 2020
Type: Caz

Alnatura Working Environment is in the city of Darmstadt in Germany, and has been designed by Haas Cook Zemmrich STUDIO2050. This building is an example of new construction realized with a people-centric and sustainable design approach.   The building is the working place of 500 employees on three floors with a floor area of approximately 10,000 m2.
Post date: 26 Iun 2020
Type: Caz