none

The Commission is in the process of updating some of the content on this website in light of the withdrawal of the United Kingdom from the European Union. If the site contains content that does not yet reflect the withdrawal of the United Kingdom, it is unintentional and will be addressed.

The goal of the project is to construct a passive church.
Post date: 13 Iun 2009
Type: Caz

Project goal was to design and build a single-family pasive house to promote energy efficiency in buildings and demonstrate technical and economical fasibility.
Post date: 13 Iun 2009
Type: Caz

Project goal was to design and build an energy efficient single-family house to promote energy efficiency in buildings and demonstrate technical and economical fasibility.
Post date: 13 Iun 2009
Type: Caz

The goal of the project is to develop and transfer innivative know-how in the area of energy consulting (energy auditing).
Post date: 13 Iun 2009
Type: Caz

Friendly House is a nationwide educational programme focused on improving the energy efficiency in buildings. The scope of the program is energy efficient design, modernization, and exploitation of buildings. The actions include promotion of building certification implemented by the European directive 2002/91/EC as well. The programme targets private and corporate investors, tenants, building managers, local authority officers, key professional groups and media.
Post date: 13 Iun 2009
Type: Caz

The Borgen Community Centre is located in a suburban area in Asker close to Oslo, the capital of Norway. The Borgen School was built in 1970 and retrofitted and converted in 2005 to Borgen Community Centre, a place for the whole neighbourhood. The Centre contains public services and private organisations. The main building contains a secondary school and facilities for health-care services and leisure-time arrangements. One goal was to increase the possibilities for the local community to use the facilities, and thereby obtain social and economic benefits.
Post date: 12 Iun 2009
Type: Caz

Year of construction:    1924 Year of renovation (start):  2006-2007 Number of storey:   1 Heated volume   Approx 6000 m3 Cubic contents, volume  Approx 6150 m3 Gross area    600 m2 Living area Floor area (heated space)  550 m2 (net) Window/glass areas   5 % 4.1.2. Site The church is located in a mountain valley in the centre of Norway’s Southern part, located by the railway line half way between Oslo and Bergen and only minutes form the popular winter ski resort Geilo. 60 degrees North, 8 degrees East.
Post date: 12 Iun 2009
Type: Caz

The Ecobuildings project BRITA in PuBs was started in May 2004 to increase the market penetration of innovative and effective retrofit solutions in order to improve energy efficiency and implement renewables with moderate additional costs. As main topic the exemplary retrofit of 8 demonstration public buildings in the four participating European regions (North, Central, South, East) was realised. By choosing public buildings of different types such as colleges, cultural centres, nursing homes, university buildings and churches etc.
Post date: 12 Iun 2009
Type: Caz

Building
Post date: 12 Iun 2009
Type: Caz